Projects

Four-laning of NH-39 Dimapur- Kohima Road

Construction of Four Laning of part of Ramban to Banihal Section of NH-1A

Construction of Balance work of 2 Lane with Paved Shoulder of Joram Koloriang Road (NH-713)

Holongi to Itanagar section of NH-415

Bhagalpur - Kahalgoan- Mirzachowki section in the State of Bihar

Construction of Mitigation Measures structures on CH/MH Border to Wainganga Bridge Section of NH-6

Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway

Rimuli -Koida section in the state of Odisha

Rehabilitation and up gradation of Two Laning with Paved Shoulder for Jind to Gohana Section

Rehabilitation and up gradation of 2-lane with paved shoulder for Jind Kamal Section

Balance work of 4-laning of Indore-Gujarat/MP Border-Machilya Ghat Section

Output and Performance based Road Contract (OPRC) (Asset Management Contract) for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bathinda Contract Area

FOUR LANING OF PINJORE (END OF PINJORE BYPASS) – NALAGARH SECTION

Upgradation of Gurgaon-Pataudi-Rewari section of NH-352W

Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-25)

Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-23)

Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-24)

Eight Lane access-controlled expressway section of Delhi - Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat- Project. (Package-30)

Development of entry & exist service road Aligarh

Identification of Blackspot locations in Anakapalli to Gundugolanu section

Prioritization Of Blackspots And Piloting Improvement in Rajasthan

Agra-Etawah bypass section of NH-2

Carrying out Independent Road safety audit in selected stretches of different National Highways within the state of Assamm upto DPR Preparation

MEGHALAYA (PACKAGE-2)

MEGHALAYA (PACKAGE-1)

Vadodara-Mumbai Expressway

Delhi MRTS Project

Baran Aklera Highway NH-752

Six lane Gurgaon-Jaipur section of NH-48

REVISION OF GHOMAN – TANDA

DPR OF TANDA - HOSHIARPUR

DPR work of Section Hoshiarpur to Una

Upgrading Punalur to Ponkunnam road (SH8)

Construction of Etawah-Chakeri, Kanpur-Kabrai & Bara-Orai

Construction of Four lane elevated road as part of under construction Ganga Path

Widening and strengthening of Bongaon – Chakdah Road (SH-1)

Development of multi-lane carriageway

Construction of flyover from Liberty cinema to Mental Hospital on Nagpur Obedullaganj Road NH-69

Construction of VUP at Balikuda, Sikharpur and Badchana on Chandikhole-Jagatpur-Bhubaneswar Section of NH-5

Construction of Six lane Minor Bridge (Paloli Palam)

Construction of VUPs at km. 11.330 (Kalabadia Chowk)

Four laning of Aligarh- Kanpur section of NH-91

Operation & Maintenance of 4 Lane Jalandhar to Pathankot /J&K Border

Four laning of Pathankot to Amritsar section of NH-15

Four Laning of Ludhina to Talwandi section of NH-95

Technical Assessment of the corridors in Punjab/Rajasthan

Sultanpur - Pratapgarh Section of NH-96

Lokhandi-Sawargaon-Renapur Section of SH-232

Bhokardhan-Jawkheda-Deaulgaon Raja Road

Kabrai-Banda Section of NH-76

Mau – Jasra Section of NH-76

Kalupur–Lalata Section of of NH-76

Multi Sector Road Safety Strategy

Biharsharif-Barbigha-Mokama Section of NH-82

Zirakpur-Patiala Section of NH-64 (PKG-II)

Zirakpur-Patiala Section of NH-64 (PKG-I)

Tapa-Bathinda Section of NH-64

Rudauli to Ghaghara Bridge on NH-233

Bhalgarh Flyover & Major Bridge

ROB Dabwali

Jam-Warora Section of SH-264

Amaravati Capital Development Project (Lot-B)

Major Bridge Over River Yamuna

ROB cum Flyover at Ranichak, West Bengal

Kanpur-Lucknow Bypass & Lucknow-Ayodhya

Sivasagar-Tekeliphuta-North Lakhimpur-Majuli-Jorhat Section

Port connectivity road corridors in Andhra Pradesh

Mudki-Rampura Section of NH-254

Pukhraya-Ghatampur-Bindaki Road (SH-46)

Alternative Highway to Gangtok in Sikkim

Eight Lane Vadodara-Kim Expressway (Package-II)

Eight Lane Vadodara-Kim Expressway (Package-III)

Darah-Jhalawar-Teendhar Section of NH-12

Ahmednagar-Baramati- Phaltan Roads PKG-I

Lehragaga-Jakhal Road (MDR-21)

Durgapur-Amethi Road

Palanpur-Radhanpur & Radhanpur–Samakhiyali Sections of NH-14 & 15

Nagaur Bypass-Netra Village Section

Raebareilly-Allahabad Section of NH-24B

Lokhandi-Sawargaon-Renapur (Latur) Road

Rohtak-Jind Section of NH-71

Lambia - Raipur Section of NH-458

Sitarganj-Bareilly Section NH-74

Maharashtra Border to Bidar Section of NH-50

OPRC (Sangrur-Mansa-Bathinda Road)

Construction of ROB in Bathinda

Lambra – Shahkot Section of NH-71

Azamgarh-Mau-Balia Road (SH-34)

Pilibhit–Khutar-Nanpara-Balrampur-Padrauna Section of NH-730

Sangrur & Dhanoula Bypass of NH-64

Nimbeherah-Pratapgarh Section of NH-113

Chittorgarh-Neemuch Section of NH-79

Amaravati Capital Development Project (Lot-B)

Consultancy Services for appointment as Authority Engineer for Design Review, Construction Supervision, Quality Assurance and Technical Auditing of 4/6 lane roads with Utility Corridors works on EPC basis in Urban Environment for Packages-XI and XII (Lot-B) in Amaravati, Andhara Pradesh State

Major Bridge Over River Yamuna

Consultancy services for Authority’s Engineer for Supervision of Construction of Road from Faridabad Greater Noida Via Jassana-Manjhawali-Atta Gujran Including Bridge Over River Yamuna Under ISC Scheme of CRF (Phase-1: Construction of Major Bridge (630 M Long) and River Training/Guide Bund Works) In the State of Haryana on EPC Mode.

ROB cum Flyover at Ranichak, West Bengal

Consultancy services for Authority’s Engineer for Supervision of Construction of ROB cum Flyover at Ranichak for replacing the existing level crossing at Ranichak, Haldia upto the Main Gate of Haldia Dock Complex in the state of West Bengal on EPC Mode.

Kanpur-Lucknow Bypass & Lucknow-Ayodhya

Independent Engineer for Operation and Maintenance for Kanpur-Lucknow Bypass and Lucknow- Ayodhya NH-25 & 28 in the State Of Uttar Pradesh on OMT Basis (OMT10) (EW). Total Length-217 Km".

Lehragaga-Jakhal Road (MDR-21)

Project Management Consultancy Services for “Rehabilitation of Sunam-Lehragaga-Jakhal Road (MDR-21) from Km 0.00 to Km 25.200 & Lehragagga to Junction with NH-148B from Km 25.200 to 37.800 in the State of Punjab.

Rohtak-Jind Section of NH-71

Project Management Consultancy for Supervision of Four laning of Rohtak-Jind Section from Km 307.00 to Km 347.800 of NH-71 and connection link from Km 347.800 NH-71 to Km 9.40 of NH-71A to execute as BOT (Toll Project) on DBFO pattern under NHDP Phase-III in the state of Haryana.

Lambia - Raipur Section of NH-458

Consultancy Services for Authority’s Engineer for Supervision of Two Laning with Paved Shoulders of Lambia - Raipur section of NH-458 from Km 163.800 (Existing Chainage km 168.290) to km 216.600 (Existing Chainage Km 222.535) (length 52.800 km) in the state of Rajasthan under NHDP PHASE-IV on (EPC) Mode”

Sitarganj-Bareilly Section NH-74

Consultancy Services for Authority Engineer for Supervision of 2 Laning with paved shoulder of Sitarganj-Bareilly Section NH-74 (new NH-30) FROM Km 254.820 to Km 329.880 in the State of Uttar Pradesh and Uttarakhand on EPC mode under NHDP Phase IV.

OPRC (Sangrur-Mansa-Bathinda Road)

PMC for “Output and Performance Based Road Contract (OPRC) (Asset Management Contract) for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bathinda Contract Area in the State of Punjab funded by World Bank.

Azamgarh-Mau-Balia Road (SH-34)

Consultancy Services for preparation of Detailed Feasibility Report for up-gradation of Azamgarh-Mau-Balia Road (SH-34) in the State of Uttar Pradesh

Alternative Highway to Gangtok in Sikkim

Consultancy for Preparation of Feasibility Report cum Preliminary design for alternative Highway to Gangtok in Sikkim via Bagrakot-Chuikhim-Nimbong-Kafer-Bakhim-Algarah-Rhenok in the State of West Bengal and from Rhenok-Rorathang-Pakyong along with spur from Aritar-Rolep-Menla in the State of Sikkim.

Pukhraya-Ghatampur-Bindaki Road (SH-46)

Consultancy Services for preparation of Detailed Feasibility Report for up-gradation of Pukhraya-Ghatampur-Bindaki Road (SH-46) in the State of Uttar Pradesh

Mudki-Rampura Section of NH-254

Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for NH-254 in KM 0.00 to 82.27 Section of Length 82.27 KM Mudki to Rampura in the State of Punjab on BOT/EPC/Hybrid Annuity Mode.

Port connectivity road corridors in Andhra Pradesh

Consultancy Services for project preparation of Feasibility Study/Detailed Project Report of selected Port connectivity road stretches/corridors for up gradation to two/four lane NH configuration under Bharat Mala scheme in the states of Andhra Pradesh under – Contract Package No. NHAI/PC/1.

Sivasagar-Tekeliphuta-North Lakhimpur-Majuli-Jorhat Section

Consultancy Services for Feasibility Study and preparation of Detailed Project Report for Construction of roads of NH standard (2-Lane) with major bridges over river Brahmaputra, Sabansiri, Khabalu & Lohit along the alignment from Sivasagar-Desangmukh-Tekeliphuta-Dhakuakhana-North Lakhimpur-Majuli-Jorhat in the state of Assam. Package No. PWD-NH(R)/FS&DPR/NGN&JOR/2017-18/01(RT2).

DPR work of Section Hoshiarpur to Una

Consultancy Services for balance DPR work of Section Hoshiarpur to Una upto Pb./HP border including Hoshiarpur Bypass.

DPR OF TANDA - HOSHIARPUR

CONSULTANCY SERVICES FOR PREPARATION OF DPR OF TANDA - HOSHIARPUR INCLUDING BYPASS ON WEST SIDE OF TANDA (TENTATIVE LENGTH KM.30.700)

REVISION OF GHOMAN – TANDA

CONSULTANCY SERVICES FOR REVISION OF GHOMAN – TANDA PROJECT IN THE STATE OF PUNJAB.

Output and Performance based Road Contract (OPRC) (Asset Management Contract) for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bathinda Contract Area

Output and Performance based Road Contract (OPRC) (Asset Management Contract) for Improvement, Rehabilitation, Resurfacing & Routine Maintenance Works of Roads of Sangrur-Mansa-Bathinda Contract Area

Delhi MRTS Project

Design and Construction of Underground UP & Down Tunnels by Shield TBM from end of Cut & Cover tunnel near Sangam Vihar metro Station up to existing Sarita Vihar depot, Underground Ramp and Cut & Cover Tunnels near Sangam Vihar and Tughlakabad metro station and three Underground Metro Stations at Maa Anandmayee Marg, Tughlakabad Railway Colony and Tughlakabad including Retrieval/Launching shafts on Aerocity Tughlakabad corridor of Delhi MRTS Project of Ph-IV.

Baran Aklera Highway NH-752

Strengthening/ Reconstruction from Km 0/0 to 1/200, 1/800 to 42/400, 43/900 to 44/100, 47/400 to 59/100, 64/450 to 72/080, 72/680 to 78/750, 79/050 to 88/330 of NH-752 in the state of Rajasthan for the year 2021-22 (Total Length 76.680 Km) on EPC mode.

Six lane Gurgaon-Jaipur section of NH-48

Construction of additional structures on six lane Gurgaon-Jaipur section of NH-48 between km. 42+700 to km. 273+000 in the state of Haryana & Rajasthan on EPC mode.

Upgrading Punalur to Ponkunnam road (SH8)

Upgrading Punalur to Ponkunnam road (SH8) Package 8B: KM. 29+840 (Konni) to Km. 60+000 (Placher).

Sultanpur - Pratapgarh Section of NH-96

Consultancy Services for Preparation of Detailed Design for Rehabilitation and Up-gradation of Sultanpur - Pratapgarh section of NH-96 from existing km 60/000 to km 90/000 [Design Ch. 60.000 to Ch. 90.865] to Two lane with paved shoulders in the state of Uttar Pradesh on EPC basis contract.

Eight Lane Vadodara-Kim Expressway (Package-II)

Consultancy Services for Preparation of Detailed Design for Construction of 8-Lane Vadodara Kim Expressway from Km 323.00 to Km. 355.00 (Sanpa To Padra Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase – II on EPC Mode”- Package II.

Eight Lane Vadodara-Kim Expressway (Package-III)

Consultancy Services for Preparation of Detailed Design for Construction of 8-Lane Vadodara Kim Expressway from Km 292.00 to Km. 323.00 (Manubar to Sapna Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase-IV on Hybrid Annuity Mode” (Phase IA - Package III).

Darah-Jhalawar-Teendhar Section of NH-12

Consultancy Services for Preparation of Detailed Design for Construction of 4-lane Road on NH-12 (New NH-52) from Km 299.000 to 346.540 (Design Chainage From 9.860 to 58.740) (Darah-Jhalawar-Teendhar section) in the State of Rajasthan under NHDP Phase-III (Length 48.880 Km.) - Package II Project on (“DBOT Annuity or Hybrid Annuity”)

Ahmednagar-Baramati- Phaltan Roads PKG-I

Consultancy Services for Preparation of Detailed Design for Rehabilitation and Upgradation of Ahmednagar-Baramati- Phaltan (SH-60, SH-157 & SH-152), Package I, Ahmednagar- Kinetic Chowk to VasundePhata, from Km. 0+000 to Km. 93+800 to Two lane with paved shoulder/Four lane configuration in the state of Maharashtra on EPC mode.

Durgapur-Amethi Road

Consultancy Services for Preparation of Detailed Design for Re-strengthening of Durgapur-Amethi Road in the state of Uttar Pradesh.

Palanpur-Radhanpur & Radhanpur–Samakhiyali Sections of NH-14 & 15

Consultancy Services for Preparation of Detailed Design for Operation & Maintenance of Palanpur-Radhanpur Section (From km. 340.00 to km. 458.00) of NH-14 and Radhanpur –Samakhiyali Section (From Km. 138.8 to Km. 281.3) of NH-15 on OMT Basis (Package-I).

Nagaur Bypass-Netra Village Section

Consultancy Services for Preparation of Detailed Design for Widening to Two-lane with Paved Shoulders with Provision of 4-lane in Urban Stretches and Geometric Improvement, wherever required, as per accepted Alignment from Km. 180+500 (End of Nagaur Bypass) to Km. 267+500 (Netra Village near Jodhpur) in the State of Rajasthan.

Raebareilly-Allahabad Section of NH-24B

Consultancy Services for Preparation of Detailed Design for Construction & Development of “2-Lanning with paved shoulder of Raebareilly to Allahabad section of NH-24B in the state of Uttar Pradesh on (DBFOT) on Toll Basis”.

Maharashtra Border to Bidar Section of NH-50

Consultancy Services for Preparation of Detailed Design for Widening to 2/4 Lane with Paved Shoulders from Km 0.000 to Km 54.370 (Maharashtra Border to Bidar) Section of NH-50 in the State of Karnataka (Package-I).

Construction of ROB in Bathinda

Consultancy Services for Preparation of Detailed Design for Construction of approaches to ROB on existing level crossing no. A-227B/E-2 on Bathinda-Delhi rail section at km 273/4-5 & at km 96.00 of Bhwanigarh-Sunam-Bhikhi-Kotshamir road, near Bhai Bakhtour, Dist. Bathinda along with service lanes and diversion road on EPC basis.

Lambra – Shahkot Section of NH-71

Consultancy Services for Preparation of Detailed Design for Development of 4-lanes with paved shoulders of Lambra – Shahkot section of NH-71 [New NH No. 52] from existing km 12.000 to 44.600 including construction of Nakodar and Shahkot bypasses in the State of Punjab on EPC mode under NHDP-IV

Pilibhit–Khutar-Nanpara-Balrampur-Padrauna Section of NH-730

Consultancy Services for Preparation of Detailed Design for Widening and Strengthening of the existing Road from Km. 505.000 to Km. 538.000 on the Pilibhit–Puranpur-Khutar-Gola-Nanpara-Balrampur-Maharajganj-Padrauna Road Section of NH-730 in Uttar Pradesh by Two laning with Paved Shoulders.

Sangrur & Dhanoula Bypass of NH-64

Consultancy Services for Preparation of Detailed Design for Four Laning of Sangrur Bypass & Dhanoula Bypass (Patiala-Sangrur-Barnala-Bathinda Section) of NH - 64 from km. 110.720 to km. 123.900 (existing chainage from km 106.170 to km. 116.950) Sangrur Bypass and from km. 144.900 to km. 149.960 (existing chainage from km 138.030 to km. 142.950) Dhanoula Bypass.

Nimbeherah-Pratapgarh Section of NH-113

Consultancy Services for Preparation of Detailed Design for 4-lanning of Nimbeherah-Pratapgarh Section of NH-113 in the State of Rajasthan.

Chittorgarh-Neemuch Section of NH-79

Consultancy Services for Preparation of Detailed Design for 4-lanning of Chittorgarh-Neemuch Section of NH-79 in the State of Rajasthan.

Four-laning of NH-39 Dimapur- Kohima Road

Road Safety Consultancy for Balance work for Four-laning of NH-39 Dimapur- Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construction(EPC) Contract (Package-III)

Construction of Four Laning of part of Ramban to Banihal Section of NH-1A

Road Safety Consultancy Services for Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), from Ch.165+092 to Ch.171+855 (North Bound) and from Ch.166+895 to Ch.173+638 (South Bound), excluding section from Ch.166+610 to Ch.167+150 (North Bound), Ch.168+425 to Ch.168+935 (South Bound) and Section from Ch.167+960 to Ch.168+168 (North Bound), Ch.169+745 to Ch.169+951 (South Bound) (Package-II & Package-III)

Construction of Balance work of 2 Lane with Paved Shoulder of Joram Koloriang Road (NH-713)

Construction of Balance work of 2 Lane with Paved Shoulder of Joram Koloriang Road (NH-713) on EPC Basis From Existing Km 138.00 to Km 158.00 (Design Km 122.353 to Km 138.389) Design Length 16.036 Km in the State of Arunachal Pradesh Under SARDP-NE

Holongi to Itanagar section of NH-415

Protection & Mitigation of landslide and erosion of road formation from km 10+000 to km 29+5000 of Holongi to Itanagar section of NH-415 on EPC mode in the state of Arunachal Pradesh

Bhagalpur - Kahalgoan- Mirzachowki section in the State of Bihar

Rehabilitation & Widening work for 2 Lane with paved shouldering of Existing National Highway 80 Alignment from Km. 132.895 to Km. 190.150 Bhagalpur - Kahalgoan- Mirzachowki section in the State of Bihar

Construction of Mitigation Measures structures on CH/MH Border to Wainganga Bridge Section of NH-6

Construction of Mitigation Measures structures on CH/MH Border to Wainganga Bridge Section of NH-6 (New NH-53) in the State of Maharashtra under Bharat mala Pariyojana on EPC Mode.

Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway

Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with NH3 and Taran taran Bypass near Mannawalla village chainage 70+950 to Junction with NH354 Ajanala road near Harsh china village chainage 99+020 (km 70.950 to km 99.020 of Amritsar connectivity) on EPC mode under Bharatmala Pariyojna in the state of Punjab

Rimuli -Koida section in the state of Odisha

Construction of New 6-Lane Major Bridge including approaches from Km 172+895 to Km 173+670 of NH-215 (New NH 520) Rimuli -Koida section in the state of Odisha under NHDP phase -III on EPC mode.

Rehabilitation and up gradation of Two Laning with Paved Shoulder for Jind to Gohana Section

Safety Consultant For Rehabilitation and up gradation of Two Laning with Paved Shoulder for Jind to Gohana Section from existing Km.0+000 to Km 50+505 (Length-50.505km) of NH-352A on EPC Mode under NHDP in the State of Haryana.

Rehabilitation and up gradation of 2-lane with paved shoulder for Jind Kamal Section

Safety Consultant For Rehabilitation and up gradation of Two Laning with Paved Shoulder for Jind to Karnal Section from existing km.68+660(Design km.68+857) i.e. Junction with Narwana Road(NH-352) at Subhash Chowk and ends at km 153+700(Design 154+219) at ITI Chowk which is interaction with NH-1 of NH-709A in the State of Haryana under NH(O) on EPC Mode(Package-II)

Balance work of 4-laning of Indore-Gujarat/MP Border-Machilya Ghat Section

Road Safety Consultancy for Balance work of 4-laning of Indore-Gujarat/MP Border from km 106.210 to km 115.250 (Start and end point of Bird Sanctuary), km 121.740 to km 127.140 (Machilya Ghat Section) and Forest portion km 149.800 to km 150.850, km 158.250 to km 158.850 of NH-47 (Old-59) on EPC Mode in the State of Madhya Pradesh

FOUR LANING OF PINJORE (END OF PINJORE BYPASS) – NALAGARH SECTION

CONSTRUCTION OF FOUR LANING OF PINJORE (END OF PINJORE BYPASS) – NALAGARH SECTION FROM KM 4+200 TO KM 35+395 ON NH- 105 (OLD NH-21A) IN THE STATE OF HARYANA AND HIMACHAL PRADESH ON EPC MODE UNDER BHARATMALA PARIYOJNA

Upgradation of Gurgaon-Pataudi-Rewari section of NH-352W

Upgradation of Gurgaon-Pataudi-Rewari section of NH-352W four laning section from Dwarka Expressway to Rewari (NH-71 Jn.) (Km.0.00 to km.43.87) and six laning section from Hero Honda Chowk to Umang Bhardwaj Chowk (km 0.00 to km 2.240) (Design length 46.11 km) as feeder route under Bharatmala Pariyojana in the state of Haryana on EPC mode.

Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-25)

Construction Of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border (Ch. 673.700 to 696.920; Design Ch.221.350 to 244.500) Section of Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-23)

Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-23)

Construction Of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border (Ch. 673.700 to 696.920; Design Ch.221.350 to 244.500) Section of Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-23)

Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-24)

Construction Of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border (Ch. 673.700 to 696.920; Design Ch.221.350 to 244.500) Section of Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh (Pkg-24)

Eight Lane access-controlled expressway section of Delhi - Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat- Project. (Package-30)

Construction of Eight Lane access-controlled expressway from junction with SH-175 near Baletiya village of Panchmahal district to junction with SH-63 near Pratap Nagar village of Vadodara district (Ch. 803+420 to 824+920; design Ch. 351+000 to Ch. 372+500) section of Delhi - Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat- Project. (Package-30).

Development of entry & exist service road Aligarh

Road Safety Consultancy for Development of entry & exist service road for newly built Wonder Cement Manufacturing Unit along NH-91 (ch. 113+759 RHS) village Somna Tehsil Gabhana district Aligarh U.P.

Identification of Blackspot locations in Anakapalli to Gundugolanu section

Preparation of feasibility / DPR to take up the long-term measures by providing LVUP/VUP/Service Roads/Junction Improvement/Solar Blinkers/Highway Lighting for rectification of 11 Nos of MORTH identified Blackspot locations in Anakapalli to Gundugolanu section from Km. 741.255 to Km 1022.494 in the State of Andhra Pradesh

Prioritization Of Blackspots And Piloting Improvement in Rajasthan

Consultancy Services for Prioritization Of Blackspots And Piloting Improvement Of About 20 High-Priority Blackspots in the State of Rajasthan. (Package: WB/RSHDPII/RS/04)

Agra-Etawah bypass section of NH-2

Safety Consultants for Agra-Etawah bypass section of NH-2 from km. 199.660 to km. 323.525, Agra to Aligarh section of NH-93 from km. 153.000 to km. 234.215 on BOT mode, Agra-bypass (Southern) from km. 0+000 to km. 32+800

Carrying out Independent Road safety audit in selected stretches of different National Highways within the state of Assamm upto DPR Preparation

Carrying out Independent Road safety audit in selected stretches of different National Highways within the state of Assam

MEGHALAYA (PACKAGE-2)

Road Safety Audit and Suggesting Improvement of Sharp Curve and Other Necessary Road Safety Measures on the Selected Stretches of National Highways in the State of Meghalaya

MEGHALAYA (PACKAGE-1)

ROAD SAFETY AUDIT AND SUGGESTING IMPROVEMENT OF SHARP CURVE AND OTHER NECESSARY ROAD SAFETY MEASURES ON THE SELECTED STRETCHES OF NATIONAL HIGHWAYS IN THE STATE OF MEGHALAYA. (PACKAGE-1)".

Vadodara-Mumbai Expressway

Appointment of Safety Consultants for Vadodara-Mumbai Expressway from Km 217.500 to Km 292.000, Packages-4,5,6 on HAM (Total Length: 74.50 Km)

Construction of Etawah-Chakeri, Kanpur-Kabrai & Bara-Orai

Safety Consultant for 3 Projects (Etawah-Chakeri Section of NH-2 (New NH-19), Kanpur-Kabrai Section of NH-86 (New NH-34) and Bara-Orai section of NH-25 (New NH-27) on BoT Mode

Construction of Four lane elevated road as part of under construction Ganga Path

Safety Consultant for Construction of Four lane elevated road as part of under construction Ganga Path (Digha to Deedarganj) from Dulli Ghat (ch. 13+525.79km) to Nuruddin Ghat (Ch. 16+975.79 km), from Dharamshala Ghat (Ch. 19+890km) to Old NH-30 along with connectivity to Ashok Rajpath at Kangan Ghat (Ch. 15+700km) and Patna Ghat (Ch.16+600km) with allied facilities at Patna in state of Bihar on EPC mode.

Widening and strengthening of Bongaon – Chakdah Road (SH-1)

Safety Consultant for widening and strengthening of Bongaon – Chakdah Road (SH-1) from 2-lane with paved shoulder to standard 4-lane configuration from 0+000 to 6+717 km and from 10+568 to 31+328 km, including 2 truck terminals in Phase 1 (Part A, project length of 27.477 km) excluding Gopalnagar ROB and flyover in the district of North 24 Parganas and Nadia

Development of multi-lane carriageway

Safety Consultant for Development of multi-lane carriageway from km. 704.200 to km. 723.000 (from Kanhan to automotive square) section of urban link of Nagpur Kamptee section of Nagpur Jabalpur road of NH-44 to be executed on EPC mode.

Construction of flyover from Liberty cinema to Mental Hospital on Nagpur Obedullaganj Road NH-69

Safety Consultant for Construction of flyover from Liberty cinema to Mental Hospital on Nagpur Obedullaganj Road NH-69 in the State of Maharashtra on EPC Basis.

Construction of VUP at Balikuda, Sikharpur and Badchana on Chandikhole-Jagatpur-Bhubaneswar Section of NH-5

Safety Consultant for Construction of VUP at Balikuda, Sikharpur and Badchana on Chandikhole-Jagatpur-Bhubaneswar Section of NH-5 from Km.414.00 to Km.419.00 and Km.0.00 to 62.00 (Length 67.00 Km) in the state of Odisha to be executed as BOT (Till) project on DBFOT Pattern under NHDP Phase V” - under NH-Division, Bhubaneswar (Odisha)

Construction of Six lane Minor Bridge (Paloli Palam)

Safety Consultant for Construction of Six lane Minor Bridge (Paloli Palam) at Km 203.160, Major Bridge (Moorad) at Km 204.895 & allied works like 6 lane Main Carriageway with Service Road for the section Km.203.000 to Km.205.100 (length of 2.1 Km) of NH-17 (New NH-66) under Bharatmala Pariyojna in the State of Kerala on EPC mode.

Construction of VUPs at km. 11.330 (Kalabadia Chowk)

Safety Consultant for Construction of VUPs at km. 11.330 (Kalabadia Chowk) and at km. 14.280 (Kuliana village) in Balasore-Baripada-Jharpokharia Section of NH-5 (New NH-18) in the state of Odisha to be executed on EPC Mode.

Four laning of Aligarh- Kanpur section of NH-91

Safety Consultant for Four laning of Aligarh- Kanpur section of NH-91: Packages-IV (from Naviganj- Mitrasenpur ) & Pkg- V (from Mitrasenpur- Kanpur)

Operation & Maintenance of 4 Lane Jalandhar to Pathankot /J&K Border

Safety Consultant for Operation & Maintenance of 4 Lane Jalandhar to Pathankot /J&K Border from Km. 4.2303 to km. 117.750 /4.000 to km. 16.350 of NH-1A (OMT 21A)

Four laning of Pathankot to Amritsar section of NH-15

Safety Consultant for Four laning of Pathankot to Amritsar section of NH-15 from km. 6+082 to km. 108+502 in the state of Punjab under NHDP Phase III on DBFOT basis (Now NH-54)

Four Laning of Ludhina to Talwandi section of NH-95

Safety Consultant for Four Laning of Ludhina to Talwandi section of NH-95 from km. 92+000 to km. 170+00 (Length 78km) in the state of Punjab to be executed on BOT (Toll) on DBFOT basis under NHDP Phase-III

Technical Assessment of the corridors in Punjab/Rajasthan

Technical Assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions in the state of Punjab.

Lokhandi-Sawargaon-Renapur Section of SH-232

Safety Consultancy for Rehabilitation and Up-gradation of Lokhandi-Sawargaon- Renapur (Latur) Road from existing km 32+225 to 66+693 (SH-232) (Design km. 32+225 to km 66+688) & Ambejogai Bypass from Existing/Design Chainage 0+000 to km 3+815 (SH 211) Two/Four lane with paved shoulders Configuration in the state of Maharashtra on EPC Mode.

Bhokardhan-Jawkheda-Deaulgaon Raja Road

Safety Consultancy for Bhokardhan-Hasnabad-Jawkheda-Rajur-Deaulgaon Raja Highway from 0+000 (Kumbhari Fata) to km 63+900 (Deaulgaon Raja) and extension from 17+900E (Jawkheda Fata) to 20+730E (Talegaon Fata) Total 66.730 kms to Two lane with paved shoulders in the state of Maharashtra on EPC Basis Contract.

Kabrai-Banda Section of NH-76

Safety Consultancy for Rehabilitation and upgradation of from km. 178.000 to 215.000 of NH-76 (Kabrai -Banda) to two lane with paved shoulder on EPC mode.

Mau – Jasra Section of NH-76

Safety Consultancy for Rehabilitation and upgradation of from km. 326.000 to 379.555 of NH-76 (Mau – Jasra) to two lane with paved shoulder on EPC mode.

Kalupur–Lalata Section of of NH-76

Safety Consultancy for Rehabilitation and upgradation of from km. 285.000 to 326.000 of NH-76 (Kalupur – Lalata Road) to two lane with paved shoulder on EPC mode.

Multi Sector Road Safety Strategy

Road Safety & Environmental Studies for Develop Model Safe Corridor Demonstration Program (SCDP) for Implementation of Multi Sector Road Safety Strategy in the Stretch from Jalukbari Police Point to Khanapara Police Point via Road-MG Road-GS Road in the City of Guwahati in Assam, World Bank.

Biharsharif-Barbigha-Mokama Section of NH-82

Safety Consultancy for Two Laning with paved shoulders of Biharsharif-Barbigha-Mokama Section of NH-82 from Design Chainage km 94.478 (Existing Chainage Km 119.320 of NH-31) to Km 149.053 (Exiting Chainage Km 149.020 of NH-82) [Total Design Length – 54.575 Km] in the State of Bihar on EPC mode.

Zirakpur-Patiala Section of NH-64 (PKG-II)

Safety Consultancy for Rehabilitation and upgradation of NH-64 from km 28.110 to 50.000 (Zirakpur to Patiala Section) to 4-lane in Punjab on EPC basis.

Zirakpur-Patiala Section of NH-64 (PKG-I)

Safety Consultancy for Rehabilitation and Upgradation of NH-64 from km 0.000 to 28.110 (Zirakpur to Patiala Section) to 4 lane in Punjab on EPC,

Tapa-Bathinda Section of NH-64

Safety Consultancy for Development to Four-Lanes with paved side shoulders of Tapa to Bathinda section of NH-64 [New NH No. 7] from existing Km 168/0 to Km 209/405 in state of Punjab on Engineering Procurement and Construction (EPC) Mode.

Rudauli to Ghaghara Bridge on NH-233

Proof Consultancy Services – Proof Checking of All Design & Drawing for the Project of Widening & Strengthening to Two-Lane with paved shoulder of Rudauli (Existing chainage km 66.300) to Ghaghara Bridge abutment on Basti town side, section of NH 233 from km 0.000 (Existing chainage km 0.000) to km 122.270 (Existing chainage km 123.000) in the state of Uttar Pradesh under NHDP Phase– IV on EPC mode.

Bhalgarh Flyover & Major Bridge

Safety Consultancy for Design and Construction of of Bhalgarh Flyover at Km 42 (NH-1) and Major Bridge at Km 32 (NH-1) over Drain No. 8.

ROB Dabwali

Safety Consultancy for Design and Construction of ROB over Railway crossing No. 32‐B on Bhatinda Suratgarh Railway Line on NH‐10 at km 315.240 in Dabwali Town in State of Haryana.

Jam-Warora Section of SH-264

Road Safety Audit for Jam Warora SH 264 (Maharashtra) 4 Lane 42 KM

Lokhandi-Sawargaon-Renapur (Latur) Road

Safety Consultant for Rehabilitation and Up-gradation of Lokhandi Sawargaon- Renapur(Latur) Road from existing km 32+225 to 66+693 (SH-232) (Design km. 32+225 to km 66+688) & Ambejogai Bypass from Existing/Design Chainage 0+000 to km 3+815 (SH 211) Two/Four lane with paved shoulders Configuration in the state of Maharashtra on EPC Mode.

Traffic and Utility diversion for pre-bid engineering of NCRTC RRTS project. Package-VIII

Traffic and Utility diversion for pre-bid engineering of NCRTC RRTS project. Package-VIII

Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor

Pre-Bid Engineering work Order for the work of Project :- "Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 27+000 (Vill-Lohadda) to Design Chainage 56+500 (Vill-Karaunda Mahajan) in the state of Uttar Pradesh on EPC Mode (Package-II)

Construction of Gurgaon Pataudi - Rewari section of NH-352W

Pre-Bid Engineering work Order for the work of Project :- "Construction of Gurgaon Pataudi - Rewari section of NH-352W (design length 46.110 km) as Feeder route in the state of Haryana on EPC Mode.

Patan (Near Khan Sarover lake) to Gojariya in Gujarat

Pre-Bid Engineering work Order for the work of Project :- "Construction of Four Lane Divided Carriageway with Paved Shoulder from Patan (Near Khan Sarover lake) to Gojariya km 49+775 (design) to km 128+950 (design) length=79.175 km (Package-II) of NH-68 in the State of Gujarat under NHDP V on EPC mode.

Construction of Eight Lane access-controlled expressway

Construction of Eight Lane access-controlled expressway starting from MP/Gujarat Border near Chhayan village and ending after Bridge Over Hadaf River near Hathiyavan village in Dahod district (Ch. 696+920 to 729+755) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat

Four Lane Divided Carriageway with Paved Shoulder from Patan (Near Khan Sarover lake) to Gojariya

Construction of Four Lane Divided Carriageway with Paved Shoulder from Patan (Near Khan Sarover lake) to Gojariya km 49+775 (design) to km 128+950 (design) length=79.175 km (Package-II) of NH-68 in the State of Gujarat under NHDP V on EPC mode.

Construction of Gurgaon - Pataudi - Rewari section of NH-352W

Construction of Gurgaon - Pataudi - Rewari section of NH-352W (design length 46.110 km) as Feeder route in the state of Haryana on EPC Mode.

Six lane access control greenfield highway of Delhi-Saharanpur-Dehradun

Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana – Package III

Four-lane ring road bypass around Srinagar city

Construction of four-lane ring road bypass around Srinagar city from km 0.000 to km 42.100 Phase-I on Engineering, Procurement and Construction EPC Mode under NHDP Phase VII in the Union Territory of Jammu and Kashmir

E-Traffic and Utility diversion

E-Traffic and Utility diversion for pre-bid engineering of NCRTC RRTS project. Package-III & VIII.

Amritsar-Jamnagar Economic Corridor (Package-8)

Pre-Bid Engineering Consultancy Services for Construction of 6-lane access controlled Greenfield highway from km 180+000 to km 207+100 of Deogarh (near Dhandhaniya)-Rajasthan/ Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-1) (AJ/DRGB-Package-8)

Amritsar-Jamnagar Economic Corridor (Package-7)

Pre-Bid Engineering Consultancy Services for Construction of 6-lane access controlled Greenfield highway from km 150+000 to km 180+000 of Deogarh (near Dhandhaniya)-Rajasthan/ Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-1) (AJ/DRGB-Package-7)

Amritsar-Jamnagar Economic Corridor (Package-5)

Pre-Bid Engineering Consultancy Services for Construction of 6-lane access controlled Greenfield highway from km 97+000 to km 125+000 of Deogarh (near Dhandhaniya)- Rajasthan/ Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-1) (AJ/DRGB-Package-5)

Amritsar-Jamnagar Economic Corridor (Package-4)

Pre-Bid Engineering Consultancy Services for Construction of 6-lane access controlled Greenfield highway from km 72+000 to km 97+000 of Deogarh (near Dhandhaniya)-Rajasthan/ Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-1) (AJ/DRGB-Package-4)

Six Lane Bagodara-Tarapur-Vasad Road

Pre-Bid Engineering Consultancy Services for Six laning of Bagodara Tarapur Vasad Road Km.53/800 to Km. 101/900 in the state of Gujarat on DBFOMT on Modified Annuity Basis (Package-II).

Eight Lane Vadodara-Kim Expressway (PKG-V)

Pre-Bid Engineering Consultancy Services for Construction of Eight Lane Vadodara Kim Expressway From Km 254.430 to Km 279.000 (Kim to Ankleshwar Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on EPC mode (Phase IA – Package V).

Eight Lane Vadodara-Kim Expressway (PKG-IV)

Pre-Bid Engineering Consultancy Services for Construction of Eight Lane Vadodara Kim Expressway From Km 279.00 to Km 292.00 (Ankleshwar to Manubar Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on EPC mode (Phase IA-Package IV).

Eight Lane Vadodara-Kim Expressway (PKG-III)

Pre-Bid Engineering Consultancy Services for Construction of Eight Lane Vadodara Kim Expressway From Km 292.00 to Km 323.00 (Manubar to Sanpa Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on EPC mode (Phase IA - Package III).

Eight Lane Vadodara-Kim Expressway (PKG-II)

Pre-Bid Engineering Consultancy Services for Construction of Eight Lane Vadodara Kim Expressway From Km 323.00 to Km 355.00 (Sanpa to Padra Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on EPC mode (Phase IA - Package II).

Eight Lane Vadodara-Kim Expressway (PKG-I)

Pre-Bid Engineering Consultancy Services for Construction of Eight Lane Vadodara Kim Expressway From Km 355.00 to Km 378.740 (Padra to Vadodara Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on EPC mode (Phase IA Package I).

Six Lane Greenfield Udaipur Bypass (PKG-IV)

Pre-Bid Engineering Consultancy Services for Six lane of Greenfield Proposed Udaipur bypass [Connection between NH-76 at existing km 118+500 at Debari to NH-8 Km 287+400 at Kaya village (Udaipur bypass -Length 23.883)] on hybrid annuity Mode, Package-IV under NHDP phase V in the State of Rajasthan.

Two Lane Rhenok-Rorathang-Pakyong Section of NH-717A in Sikkkim

Pre-Bid Engineering Consultancy Services for Construction of up-gradation of existing road to 2-lane with paved shoulder including geometric improvement from Km. 0.00 0 to Km. 26.706 in Rhenok-Rorathang-Pakyong of NH-717A on EPC basis under SARDP-NE Phase ‘Á’ in the State of Sikkim.

Two/Four Lane Nandurbar-Khetia Section of SH-4 & 5

Pre-Bid Engineering Consultancy Services for Rehabilitation and Up-gradation of Nandurbar (Near Kolde)- Prakasha-Sahada-Khetia (SH-4 & SH-5) State Highway from existing km 50+260 of SH 5, (Kolde) to km 90+220 (Khetia) [Design km.50+200 to km.98+800] to Two lane with paved shoulders/4 lane in the State of Maharashtra on (EPC) Basis Contract.

Two/Four Lane Nandurbar-Prakasha Section of SH-5

Pre-Bid Engineering Consultancy Services for Rehabilitation and Up-gradation of Visarwadi (Near junction of NH-6)-Nandurabar-Prakasha (SH-5) State Highway from existing km 0+000 of SH 5, (Vissarwadi) to km 50+260 (Kodle village) [Design km.0+000 to km.50+200] to Two lane with paved shoulders/4 lane in the State of Maharashtra through (EPC) Contract.

Four Lane Jhansi-Khajuraho Section of NH-75/76 (PKG-II)

Pre-Bid Engineering Consultancy Services for Four laning of Jhansi-Khajuraho section (Pkg-II) of NH-75/76 from Design Chainage Km. 76.3 (Existing Chainage 82.100) near village Chhatipahari to Design Chainage Km. 161.7 (Existing Chainage Km. 57.9) near Bamitha town in the State of Uttar Pradesh & Madhya Pradesh under NHDP (Phase III) on Hybrid Annuity Mode.

Six Lane Delhi-Meerut Expressway

Pre-Bid Engineering Consultancy Services for Construction of Delhi-Meerut Expressway from Dasna to Meerut km 27.740 of NH-24 to km 51.975 of NH-58 (Design Chainage 28+000 to 59+983) in the state of Uttar Pradesh on EPC mode.

Four Lane Punjab/Haryana Border-Jind Section of NH-71

Pre-Bid Engineering Consultancy Services for Four laning of Punjab/Haryana Border-Jind Section of NH-71 from km. 238.695 to km. 307.000 in the State of Haryana on EPC mode.

Four Lane Porbandar - Dwarka section of NH-8E

Pre-Bid Engineering Consultancy Services for Four laning with paved shoulder of Porbandar - Dwarka section of NH-8E (Ext.) from km 356.766 (Design Chainage km 379.100) to km 473.000 (Design Chainage km 496.848) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) mode.

Four/Six Lane Bodhre-Dhule Section of NH-211

Pre-Bid Engineering Consultancy Services for Four / Six Laning of Bodhre (km 390.000) to Dhule (km 452.800) section of NH-211 (new NH No. 52); (Existing Length 62.800 km; Design Length 67.231 km) under BOT (toll) on DBFOT pattern in the state of Maharashtra under phase NHDP-IV on Hybrid Annuity Mode

Beodnabad - Ferrargunj Section of NH-223 in the Union Territory of Andaman & Nicobar Islands

Pre-Bid Engineering Consultancy Services for Rehabilitation and up-gradation of Beodnabad - Ferrargunj Section of NH-223 from Km 12.0 to Km 45.0 (excluding Km 21.0 to Km 28.0), to 2-Lane with hard shoulder in the Union Territory of Andaman & Nicobar Islands on Engineering, Procurement & Construction (EPC) Mode

Four/SIx Lane Kharar - Ludhiana Section of NH-95

Pre-Bid Engineering Consultancy Services for Development of 4/6 Laning of Kharar to Ludhiana Section of NH-95 (New NH-05) from Kharar Km. 10+185 (Design Chainage) To Samrala Chowk, Ludhiana Km. 86+199 (Design Chainage) in the State of Punjab on Hybrid Annuity Mode”.

Six Lane Section of NH-8 in Gujarat (PKG-VIII)

Pre-Bid Engineering Consultancy Services for Six Laning from existing Km 494.410 (Design Chainage 540.595) to existing Km 509.550 (Design Chainage 555.905) of NH-8 in the State of Gujarat (Length 15.310 Km) on EPC Mode under NHDP Phase-V (Package-VII).

Six Lane Section of NH-8 in Gujarat (PKG-VI)

Pre-Bid Engineering Consultancy Services for Six Laning of Km 401.200 to 494.410 of NH-8 in the States of Gujarat (Length 93.210 Km) under NHDP Phase V (Package-VI) on Hybrid Annuity Mode.

Four Lane Angul-Sambalpur Section of NH-42

Pre-Bid Engineering Consultancy Services for Rehabilitation and up-gradation to 4-laning of Angul-Sambalpur Section of NH-42 (New NH No. 55) (Km. 112.000 to Km. 265.000) in the State of Odisha under NHDP-IV

Tonk – Sawaimadhopur Section of NH-116

Pre-Bid Engineering Consultancy Services for Two Laning with Paved Shoulder of Tonk – Sawaimadhopur section from km 1.300 to km 69.750 of NH-116 in the state of Rajasthan under NHDP Phase-IV on EPC mode

Salasar-Nagaur Section of NH-65

Pre-Bid Engineering Consultancy Services for Two Laning with Paved Shoulder of Salasar-Nagaur Section of NH-65 from Km 45.400 (Design Chainage 151.141) to Km 171.170 (Design Chainage 270.735) – Design Length (119.594 Km) in the State of Rajasthan on Hybrid Annuity Mode.

Hashimara-Salsalibadi Section of NH-31

Pre-Bid Engineering Consultancy Services for Upgradation of NH-31C from Ch 182.000 (Hashimara) to Km 228.000 (Salsalibadi) to two lane with paved shoulder configuration in the District of Alipurduar, in the State of West Bengal on EPC basis contract.

Four Lane Phagwara-Rupnagar Section of NH-344A

Pre-Bid Engineering Consultancy Services for 4–laning of Phagwara- Rupnagar Section of NH- 344A from Km 0.00 (Design Chainage) to Km 80.820 (Design Chainage) in the State of Punjab on Hybrid Annuity Mode.

Four Lucknow-Sultanpur Section of NH-56

Pre-Bid Engineering Consultancy Services for 4-laning of Lucknow-Sultanpur section of NH-56 from km 11.500 to km 134.700 in the State of Uttar Pradesh under NHDP Phase-IV through Public Private Partnership (PPP) on Hybrid annuity mode.

Four Lane Kota - Jhalawar Section of NH-12

Pre-Bid Engineering Consultancy Services for Widening to 4-lane with paved shoulder with CC pavement from km 256/550 to km 289/500 on Kota - Darah Section of NH-12 (Kota - Jhalawar Road) in the State of Rajasthan on EPC mode.

Four Lane Bar-Bilara-Jodhpur Section of NH-112

Pre-Bid Engineering Consultancy Services for Four Laning of Bar-Bilara-Jodhpur Section of NH 112 from km 0.000 to km 111 .000 (Existing chainage) in the state of Rajasthan under EPC mode.

Four Lane Nagaur Bypass in Rajasthan

Pre-Bid Engineering Consultancy Services for Construction of Nagaur bypass from existing km 166/260 to km 180/500 of NH-65 through an Engineering, Procurement and Construction (EPC) Contract under NH (O) in the State of Rajasthan.

Four Lane Jalandhar-Hoshiarpur Section of NH-70

Pre-Bid Engineering Consultancy Services for Development to four-lanes with paved side shoulders of Jalandhar-Hoshiarpur section of NH-70 [New NH No. 3] from existing km 11/400 to km 49/200 including construction of Hoshiarpur bypass in the State of Punjab on EPC mode under NHDP-IV.

Four Lane Gagalheri - Saharanpur - Yamunanagar Section of NH-73

Pre-Bid Engineering Consultancy Services for Four Laning of Gagalheri - Saharanpur - Yamunanagar (UP/Haryana Border) section of NH-73 from km 33.000 (design chainage km 35.400) to km 71.640 (design chainage km 86.855) in the State of Uttar Pradesh under NHDP-IV on Hybrid Annuity Mode.

Four Lane Chutmalpur-Ganeshpur & Roorkee-Chutmalpur- Gagalheri Sections of NH-72A & NH-73

Pre-Bid Engineering Consultancy Services for Four Laning of Chutmalpur-Ganeshpur section of NH-72A from km 0.000 (km 22.825 of NH-73) to km 16.000 (Design chainagekm 17.900) and Roorkee-Chutmalpur- Gagalheri section of NH-73 from km 0.000 (km 167.800 of NH-58) to km 33.000 (Design chainage 35.400) in the States of Uttarakhand and Uttar Pradesh under NHDP Phase-IV on Hybrid Annuity Mode.

Four Lane Tallewall-Barnala Section of NH-71

Pre-Bid Engineering Consultancy Services for Development to four lanes with paved shoulders of Tallewall-Barnala Section of NH–71 from Km 114.0 to Km 149.0 (NH-64) in the State of Punjab on Engineering Procurement and Construction (EPC) Mode under NHDP-IV

Four Lane Shahkot-Moga Section of NH-71

Pre-Bid Engineering Consultancy Services for Development to four-lanes with paved side shoulders of Shahkot -Moga Section of NH-71 [New NH No. 52] from existing km 44.600 to 77.200 in the State of Punjab on EPC mode under NHDP-IV.

Four Lane Lambra-Shahkot Section of NH-71

Pre-Bid Engineering Consultancy Services for Development to four-lanes with paved side shoulders of Lambra – Shahkot section of NH-71 [New NH No. 52] from existing km 12.000 to 44.600 including the construction of Nakodar and Shahkot bypasses in the State of Punjab on EPC mode under NHDP-IV.

Four Lane Moga-Tallewall Section of NH-71

Pre-Bid Engineering Consultancy Services for Development to four lanes with paved shoulders of Moga-Tallewall Section of NH–71 from Km 77.200 to Km 114.000 in the State of Punjab on Engineering Procurement and Construction (EPC) Mode.

Four Lane Mehsana-Himatnagar Section of SH-55

Pre-Bid Engineering Consultancy Services for Upgrading to Four Lane and Maintenance of Mehsana-Himatnagar, SH-55 under Design, Build, Finance, Operate, Maintain, and Transfer (DBFOMT) - Annuity Basis.

Four Lane Kamrej-Chalthan Section of NH-8

Pre-Bid Engineering Consultancy Services for Six Laning of Kamrej – Chalthan section from Km. 248.100 to Km. 264.350 of NH- 8 including long term remedial measures for 4 Black Spots in Kamrej Bharuch section of NH-8 in the state of Gujarat on EPC Mode.

Faridkot - Kotkapura - Bathinda Section of NH-15

Pre-Bid Engineering Consultancy Services for Widening and Strengthening of existing 2 lane carriageway to Four Lanes with paved side shoulder of Faridkot - Kotkapura - Bathinda Section of NH-15 [New NH No. 54] from existing km 221.380 of km 287.615 including Faridkot-Kotkapura Bypass on EPC.

Four Lane Zirakpur-Patiala Section of NH-64

Pre-Bid Engineering Consultancy Services for Rehabilitation and Up gradation of NH - 64 from Km. 0.00 to km 50.00 (Zirakpur to Patiala Section) to 4 - lane in the State of Punjab on EPC basis.

Four Lane Sangrur Bypass to Tapa Section of NH-64

Pre-Bid Engineering Consultancy Services for Development to 4-Lanes with paved side shoulder of End of Sangrur Bypass to Tapa of NH- 64 [New NH No. 7] from existing Km 116.950 to Km 138.030 & existing Km 142.950 to Km 168.00 in Punjab under NHDP Phase IVA on (EPC) Mode.

Four Lane Patiala Bypass to Sangrur Bypass Section of NH-64

Pre-Bid Engineering Consultancy Services for Development to Four Lanes with paved side shoulder of End of Patiala Bypass to Start of Sangrur Bypass of Section of NH- 64 [New NH No. 7] from existing Km 64.570 to Km 106.170 in the State of Punjab under NHDP Phase IVA on (EPC) Mode.

Four/Six Lane Hisar-Dabwali Section of NH-10

Pre-Bid Engineering Consultancy Services for Rehabilitation and Upgrading of Existing 2-lane Road to 4/6 of Hisar-Dabwali Section of NH-10 to be executed on EPC Mode in the State of Haryana”.

Four Lane Barmer-Sanchor-Gujarat Border Section of NH-15

Pre-Bid Engineering Consultancy Services for widening and Strengthening of Barmer- Sanchor-Gujarat Border (upto Gandhav Bridge) Section of NH-15 to Construction of Service Road in Existing Four Lane from Ch. 153.000 to Ch. 157.000, Two Lane with Paved Shoulder from Ch. 157.000 to Ch. 245.505 and Four Lane from Ch. 245.505 to Ch. 259.300 under NHDP-IV in the State of Rajasthan.

Jodhpur-Pokaran Section of NH-114

Pre-Bid Engineering Consultancy Services for Two-laning with Paved Shoulders of Jodhpur-Pokaran Section of NH-114 from (Design Chainages) Km.11.000 to 101.400 & from 126.500 to 175.433 in the state of Rajasthan under NHDP-IV.

Four Lane Sangrur & Dhanoula Bypasses of NH-64 & NH-71

Pre-Bid Engineering Consultancy Services for Sangrur & Dhanoula Bypasses (Patiala-Sangrur-Barnala-Bhatinda Section) of NH-64: Pkg-1 and Four Laning of Sangrur Punjab/ Haryana Border Section of NH–71 From Km 181.805 (Sangrur) to Km 211.390 in the State of Punjab (PHASE -1): Pkg-2

Roughness Survey and Visual Condition Survey

Pre Bid Roughness Survey and Visual Condition Survey for (i) Lucknow Kanpur NH 25 4 Lane 65 Km (ii) Lucknow Bypass NH 56 A & 56B 4 Lane 23 km (iii) Lucknow Ayodhya NH 28 4 Lane 128 Km

Moga-Tallewal Section of NH-71 (New NH-52), Punjab

Pre-Bid Engineering Services for Development to four lanes with paved side shoulders of Moga - Tallewal Section of NH- 71 ( NH No. 52) from existing km 77.200 to 114.000 in the State of Punjab on EPC Mode under NHDP-IV.

BBD Study

Pre-Bid Consultancy for Engineering Assessment, Technical Carrying out BBD Study & deriving Overlay Thickness and Traffic Survey (Traffic Volume Count) for the Sangrur–Ludhiana section of State of Punjab Highway (4 lane) under OMT.

Maheshkunt-Saharsa-Purnea Section of NH-107

Traffic Studies for Maheshkunt Saharsa Purnea NH 107 2 Lane 180 km

Corridors with low LOS in Udaipur city, Rajasthan

Traffic Studies for analysis of junctions with high number of reported crashes and corridors with low LOS in Udaipur city, Rajasthan. (Gudli Trisection Analysis) Detailed data related to network, traffic and driving behavior were collected to develop and calibrate model for the junction using VISSIM.

Typical Interchanges for Area 26, 27 and 29 of Doha City in Qatar

Turning Movement Traffic Survey Using Photo logging Camera and Travel Time Survey at Typical Intersections / Interchanges for Area 26, 27 and 29 of Doha City in Qatar. Detailed analysis included use of Traffic Modelling software PTV Vissim.

Multi Level Parking Traffic Studies

Multi Level Parking Traffic Studies-Treasure Island Mall /Naman Central Mall of two major malls located in Indore city. Data related to visitors traffic volume, parking behaviour, parking layout, token dispense process, manual guidance for locating parking spaces were collected.

Three TOLL Plazas of NH 8, Manesar to Jaipur

Seven Day Traffic Count at Three TOLL Plazas of NH 8, Manesar to Jaipur. Task involved Classified Traffic Data Collection and Analysis.

Bharatpur-Mahua Section of NH-11

Traffic Studies for Improvement of existing 2 lane road and Widening to 4 lane divided carriageway, operation & maintenance from Km. 63.00 to Km. 120.00 of NH-11 (Bharatpur - Mahua section of length 57 kms) under NHDP Phase IIIA in the state of Rajasthan (Consultancy Package No. IC/Phase IIIA/NH11/RJ/007) on BOT basis.

BBD Study

Pre-Bid Consultancy for Engineering Assessment, Technical Carrying out BBD Study & deriving Overlay Thickness and Traffic Survey (Traffic Volume Count) for the Sangrur–Ludhiana section of State of Punjab Highway (4 lane) under OMT.