ROAD SAFETY

Construction of Etawah-Chakeri, Kanpur-Kabrai & Bara-Orai

Safety Consultant for 3 Projects (Etawah-Chakeri Section of NH-2 (New NH-19), Kanpur-Kabrai Section of NH-86 (New NH-34) and Bara-Orai section of NH-25 (New NH-27) on BoT Mode


Client : NHAI - Kanpur /Delhi

Aligarh-Kanpur section of NH-91

Safety Consultant for Four laning of Aligarh- Kanpur section of NH-91: Packages-IV (from Naviganj- Mitrasenpur ) & Pkg- V (from Mitrasenpur- Kanpur)



Client : NHAI

Operation & Maintenance of 4 Lane Jalandhar to Pathankot /J&K; Border

Safety Consultant for Operation & Maintenance of 4 Lane Jalandhar to Pathankot /J&K; Border from Km. 4.2303 to km. 117.750 /4.000 to km. 16.350 of NH-1A (OMT 21A)


Client : NHAI

Four laning of Pathankot to Amritsar section of NH-15

Safety Consultant for Four laning of Pathankot to Amritsar section of NH-15 from km. 6+082 to km. 108+502 in the state of Punjab under NHDP Phase III on DBFOT basis (Now NH-54)



Client : NHAI

Four Laning of Ludhina to Talwandi section of NH-95

Safety Consultant for Four Laning of Ludhina to Talwandi section of NH-95 from km. 92+000 to km. 170+00 (Length 78km) in the state of Punjab to be executed on BOT (Toll) on DBFOT basis under NHDP Phase-III


Client : NHAI

Technical Assessment of the corridors in Punjab/Rajasthan

Technical Assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions in the state of Punjab.



Client : NHAI

Construction of Eight Lane access-controlled expressway

Safety Consultant for Construction of Eight Lane access-controlled expressway from junction with SH-175 near Baletiya village of Panchmahal district to junction with SH-63 near

Construction of Eight Lane access-controlled expressway

Safety Consultant for Construction of Eight Lane access-controlled expressway from junction with SH-175 near Baletiya village of Panchmahal district to junction with SH-63 near Pratap Nagar village of Vadodara district (Ch. 803+420 to 824+920; design Ch. 351+000 to Ch. 372+500) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat.

Client: Patel Infrastructure Ltd. Gujarat


Client: Patel Infrastructure Ltd. Gujarat

Construction of Four lane elevated road as part of under construction Ganga Path

Safety Consultant for Construction of Four lane elevated road as part of under construction Ganga Path (Digha to Deedarganj) from Dulli Ghat (ch. 13+525.79km) to Nuruddin Ghat

Construction of Four lane elevated road as part of under construction Ganga Path

Safety Consultant for Construction of Four lane elevated road as part of under construction Ganga Path (Digha to Deedarganj) from Dulli Ghat (ch. 13+525.79km) to Nuruddin Ghat (Ch. 16+975.79 km), from Dharamshala Ghat (Ch. 19+890km) to Old NH-30 along with connectivity to Ashok Rajpath at Kangan Ghat (Ch. 15+700km) and Patna Ghat (Ch.16+600km) with allied facilities at Patna in state of Bihar on EPC mode.

Client: GR-Infraprojects Ltd. - New Delhi


Client: GR-Infraprojects Ltd. - New Delhi

Up-gradation of 2-lane with paved shoulder to standard 4-lane configuration

Safety Consultancy services for Up-gradation of 2-lane with paved shoulder to standard 4-lane configuration, from 0+000 km to 6+717 km & from 10+568 km to 31+328 km including two

Up-gradation of 2-lane with paved shoulder to standard 4-lane configuration

Safety Consultancy services for Up-gradation of 2-lane with paved shoulder to standard 4-lane configuration, from 0+000 km to 6+717 km & from 10+568 km to 31+328 km including two truck terminals, in Phase-I (Part-A) i.e. total length 27.477 km excluding gopal nagar rob & flyover in the districts of North 24 Paraganas and Nadia.

Client: Bharat Vanijya Eastern Pvt. Ltd. Kolkata


Client: Bharat Vanijya Eastern Pvt. Ltd. Kolkata

Development of multi-lane carriageway

Safety Consultant for Development of multi-lane carriageway from km. 704.200 to km. 723.000 (from Kanhan to automotive square) section of urban link of Nagpur Kamptee section of Nagpur Jabalpur road of NH-44 to be executed on EPC mode.



Client : KCC Buildcon (P) Ltd. -- Gurugram

Construction of flyover from Liberty cinema to Mental Hospital on Nagpur Obedullaganj Road NH-69

Safety Consultant for Construction of flyover from Liberty cinema to Mental Hospital on Nagpur Obedullaganj Road NH-69 in the State of Maharashtra on EPC Basis.


Client : KCC Buildcon (P) Ltd. -- Gurugram

Construction of VUP at Balikuda, Sikharpur and Badchana on Chandikhole-Jagatpur-Bhubaneswar Section of NH-5

Safety Consultant for Construction of VUP at Balikuda, Sikharpur and Badchana on Chandikhole-Jagatpur-Bhubaneswar Section of NH-5 from Km.414.00 to Km.419.00 and Km.0.00 to 62.00

Construction of VUP at Balikuda, Sikharpur and Badchana on Chandikhole-Jagatpur-Bhubaneswar Section of NH-5

Safety Consultant for Construction of VUP at Balikuda, Sikharpur and Badchana on Chandikhole-Jagatpur-Bhubaneswar Section of NH-5 from Km.414.00 to Km.419.00 and Km.0.00 to 62.00 (Length 67.00 Km) in the state of Odisha to be executed as BOT (Toll) project on DBFOT Pattern under NHDP Phase V under NH-Division, Bhubaneswar (Odisha).

Client: Bansal Infraprojects - Odisa /Raipur


Client : Bansal Infraprojects - Odisa /Raipur

Construction of Six lane Minor Bridge (Paloli Palam)

Safety Consultant for Construction of Six lane Minor Bridge (Paloli Palam) at Km 203.160, Major Bridge (Moorad) at Km 204.895 & allied works like 6 lane Main Carriageway with Service Road for the section Km.203.000 to Km.205.100 (length of 2.1 Km) of NH-17 (New NH-66) under Bharatmala Pariyojna in the State of Kerala on EPC mode.

Client : E5 Infrastructure Pvt. Ltd.

Construction of VUPs at km. 11.330 (Kalabadia Chowk)

Safety Consultant for Construction of VUPs at km. 11.330 (Kalabadia Chowk) and at km. 14.280 (Kuliana village) in Balasore-Baripada-Jharpokharia Section of NH-5 (New NH-18) in the state of Odisha to be executed on EPC Mode.



Client : E5 Infrastructure Pvt. Ltd.

Lokhandi-Sawargaon-Renapur Section of SH-232

Safety Consultancy for Rehabilitation and Up-gradation of Lokhandi-Sawargaon- Renapur (Latur) Road from existing km 32+225 to 66+693 (SH-232) (Design km. 32+225 to km 66+688) & Ambejogai Bypass from Existing/Design Chainage 0+000 to km 3+815 (SH 211) Two/Four lane with paved shoulders Configuration in the state of Maharashtra on EPC Mode.

Client : GR-Infra Projects Limited

Bhokardhan-Hasnabad-Jawkheda-Rajur-Deaulgaon Raja Highway (Kumbhari Fata) to (Deaulgaon Raja) and extension (Jawkheda Fata) to (Talegaon Fata)

Safety Consultant for Bhokardhan-Hasnabad-Jawkheda-Rajur-Deaulgaon Raja Highway from 0+000 (Kumbhari Fata) to

Bhokardhan-Hasnabad-Jawkheda-Rajur-Deaulgaon Raja Highway (Kumbhari Fata) to (Deaulgaon Raja) and extension (Jawkheda Fata) to (Talegaon Fata)

Safety Consultant for Bhokardhan-Hasnabad-Jawkheda-Rajur-Deaulgaon Raja Highway from 0+000 (Kumbhari Fata) to km 63+900 (Deaulgaon Raja) and extension from 17+900E (Jawkheda Fata) to 20+730E (Talegaon Fata), Total 66.730 km, to Two Lane with Paved Shoulders in the State of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.

Client: GR-Infra Projects Limited


Client : GR-Infra Projects Limited

Kabrai-Banda Section of NH-76

Safety Consultancy for Rehabilitation and upgradation of from km. 178.000 to 215.000 of NH-76 (Kabrai -Banda) to two lane with paved shoulder on EPC mode.




Client : Centrodorstroy India Pvt. Ltd.

Mau – Jasra Section of NH-76

Safety Consultancy for Rehabilitation and upgradation of from km. 326.000 to 379.555 of NH-76 (Mau – Jasra) to two lane with paved shoulder on EPC mode.




Client : Centrodorstroy India Pvt. Ltd.

Kalupur–Lalata Section of of NH-76

Safety Consultancy for Rehabilitation and upgradation of from km. 285.000 to 326.000 of NH-76 (Kalupur – Lalata Road) to two lane with paved shoulder on EPC mode.




Client : Centrodorstroy India Pvt. Ltd.

Multi Sector Road Safety Strategy

Road Safety & Environmental Studies for Develop Model Safe Corridor Demonstration Program (SCDP) for Implementation of Multi Sector Road Safety Strategy in the Stretch from Jalukbari Police Point to Khanapara Police Point via Road-MG Road-GS Road in the City of Guwahati in Assam, World Bank.


Client : PWRD Assam (Govt. of India)

Biharsharif-Barbigha-Mokama Section of NH-82

Safety Consultancy for Two Laning with paved shoulders of Biharsharif-Barbigha-Mokama Section of NH-82 from Design Chainage km 94.478 (Existing Chainage Km 119.320 of NH-31) to Km 149.053 (Exiting Chainage Km 149.020 of NH-82) [Total Design Length – 54.575 Km] in the State of Bihar on EPC mode.

Client : GR-Infra Projects Limited

NH-64 (Zirakpur to Patiala Section)

Safety Consultant for Rehabilitation and upgradation of NH-64 from km 28.110 to 50.000 (Zirakpur to Patiala Section) to 4-lane in Punjab on EPC basis.



Client : Centrodorstroy India Pvt. Ltd.

NH-64 (Zirakpur to Patiala Section)

Safety Consultant for Rehabilitation and Upgradation of NH-64from km 0.000 to 28.110 (Zirakpur to Patiala Section) to 4 lane in Punjab on EPC.



Client : Centrodorstroy India Pvt. Ltd.

Tapa to Bathinda section of NH-64

Safety Consultant for Development to Four-Lanes with paved side shoulders of Tapa to Bathinda section of NH-64 [New NH No. 7] from existing Km 168/0 to Km 209/405 in state of Punjab on Engineering Procurement and Construction (EPC) Mode.


Client : Patel Infrastructure Limited

Rudauli to Ghaghara Bridge on NH-233

Proof Consultancy Services – Proof Checking of All Design & Drawing for the Project of Widening &

Rudauli to Ghaghara Bridge on NH-233

Proof Consultancy Services – Proof Checking of All Design & Drawing for the Project of Widening & Strengthening to Two-Lane with paved shoulder of Rudauli (Existing chainage km 66.300) to Ghaghara Bridge abutment on Basti town side, section of NH-233 from km 0.000 (Existing chainage km 0.000) to km 122.270 (Existing chainage km 123.000) in the State of Uttar Pradesh under NHDP Phase–IV on EPC mode.

Client: Vijay Construction (I) Pvt. Ltd.




Client : Vijay Construction (I) Pvt. Ltd.

Bhalgarh Flyover

Safety Consultant for Design and Construction of of Bhalgarh Flyover at Km 42 (NH-1) and Major Bridge at Km 32 (NH-1) over Drain No. 8.



Client : Gawar Construction Pvt Ltd

Bhatinda Suratgarh Railway Line on NH‐10

Safety Consultant for Design and Construction of ROB over Railway crossing No. 32‐B on Bhatinda Suratgarh Railway Line on NH‐10 at km 315.240 in Dabwali Town in State of Haryana.



Client : Gawar Construction Pvt Ltd

Jam Warora SH 264 (Maharashtra)

Road Safety Audit of Jam Warora SH 264 (Maharashtra) for ECA Infrastructure Nagpur. 4 Lane 42 KM





Client : ECA Infrastructure

Lokhandi-Sawargaon-Renapur (Latur) Road

Safety Consultant for Rehabilitation and Up-gradation of Lokhandi Sawargaon-Renapur (Latur) Road from existing km 32+225 to 66+693 (SH-232) (Design km. 32+225 to km 66+688) & Ambejogai

Lokhandi-Sawargaon-Renapur (Latur) Road

Safety Consultant for Rehabilitation and Up-gradation of Lokhandi Sawargaon-Renapur (Latur) Road from existing km 32+225 to km 66+693 (SH-232) (Design km 32+225 to km 66+688) & Ambejogai Bypass from Existing/Design Chainage 0+000 to km 3+815 (SH-211), Two/Four Lane with Paved Shoulders Configuration in the State of Maharashtra on EPC Mode.

Client: GR-Infra Projects Limited



Client : GR-Infra Projects Limited

Construction of (i) Four Lanning of Akkalkot to Solapur (including Akkalkot Bypass of Length 7.35 Km.)

Safety Consultant for Construction of (i) Four Lanning of Akkalkot to Solapur (including Akkalkot

Construction of (i) Four Lanning of Akkalkot to Solapur (Including Akkalkot Bypass of Length 7.35 Km.)

Safety Consultant for Construction of (i) Four Lanning of Akkalkot to Solapur (including Akkalkot Bypass of Length 7.35 Km.) from Km. 99.400 to Km. 138.352 of NH-150E, (ii) Solapur to Maharashtra–Karnataka Border Section of NH-9 from Km. 251.325 to Km. 348.800, and (iii) Solapur–Vijayapur in the State of Maharashtra.

Client: National Highways Authority of India



Client: National Highways Authority of India

Vadodara Mumbai Expressway -Phase II

Safety Consultant for Construction of (i) Vadodara Mumbai Expressway (Phase II –Pkg XIII) [Km. 26.582 to Km. 50.700] (Shirsad – Masvan) (ii) Vadodara Mumbai Expressway (Phase II – Pkg XI) [Km. 77.000 to Km. 103.400] (Ganjad – Talsari) (iii) Vadodara Mumbai Expressway (Phase II – Pkg XII) [Km. 50.700 to Km. 77.000] (Masvan – Ganjad) in the State of Maharashtra


Client: National Highways Authority of India

Taloda – Burhanpur Section for up-gradation to 4-lane

“Appointment of Safety Consultant for Consultancy Services for preparation of Detailed Project Report of stretches from Taloda (Km. 143.000) to Burhanpur (km. 383.000) for up-gradation to 4-lane (Length 225 km.) - DPR Stage reg.”



Client: National Highways Authority of India

4-laning Manderdisa-Hatikhali (AS-26), Udali-Manderdisa (AS-27) & Lanka-Udali section (AS-15)

Appointment of Safety Consultant for 4 laning from Manderdisa (Lumding) to Hatikhali section (AS-26) (Length 22.9km) and 4 laning from Udali to Manderdisa (Lumding) section (AS-27) (Length 20.25km) and 4 laning from Lanka to Udali section (AS-15) (Length 18 km)-O&M Stage

Client: National Highways Authority of India

Construction of 4-lanning Greenfield Highway (PKG-II, PKG-III, & PKG-IV of NH-731A

Safety Consultants for stretch under Development /Construction in the State of Uttar Pradesh (Package-II, III &IV): Construction of Four Lane Highway from Km. 35.000 to 49.155 (PKG-II), From Km. 49.155 to 74.700(PKG-III) & From Km. 74.700 to 112.950 (PKG-IV) of NH-731A on HAM in the state of Uttar Pradesh.


Client: Ministry of Road Transport & Highways

Blackspots and piloting improvement of 20 high priority blackspots

Consultancy services for Prioritization of Blackspots and piloting improvement of 20 high priority blackspots in the state of Rajasthan (Package: WB/RSHDPII/RS/04) - Comments/ Observations on Draft Inception Report.



Client: PWD, Government of Rajasthan

Agra-Etawah Bypass, Agra to Aligarh and Agra-Bypass (Southern)

Appointment of Safety Consultants for Agra-Etawah Bypass Section of NH-2 from Km.199.66 to Km.323.525, Agra to Aligarh Section of NH-93 from km 153.000 to Km. 234.215 on BOT Mode, Agra-Bypass (Southern) from Km. 0+000 to Km. 32.800 for a total length of 237.880 Km.


Client: National Highways Authority of India

8-Lanning of Vadodara – Mumbai Expressway (Package-4, 5 & 6)

Appointment of Safety Consultants for Vadodara-Mumbai Expressway from Km 217.500 to Km 292.000, Packages-4,5,6 on HAM (Total Length: 74.50 Km)



Client: National Highways Authority of India

Improvement of sharp curve and other necessary road safety measures (Pkg-1)

Road Safety Audit and suggesting improvement of sharp curve and other necessary road safety measures on the selected stretches of National Highways in the State of Meghalaya. Pkg-1.



Client: NH PWD, Government of Meghalaya

Improvement of sharp curve and other necessary road safety measures (Pkg-2)

Road Safety Audit and suggesting improvement of sharp curve and other necessary road safety measures on the selected stretches of National Highways in the State of Meghalaya. Pkg-2



Client: NH PWD, Government of Meghalaya

Independent Road Safety Audit in selected stretches of different National Highways

Carrying out Independent Road Safety Audit in selected stretches of different National Highways within the state of Assam upto DPR Preparation.



Client: NH PWD, Government of Assam

4/6 Laning of Delhi/Haryana Border to Rohtak, Rohtak- Panipat & Rohtak-Bawal Section

Safety Consultant for (i) Construction of 4/6 Laning of Delhi/Haryana Border to Rohtak section of NH-10 including Bahadurgarh and Rohtak bye-passes,

4/6 Laning of Delhi/Haryana Border to Rohtak, Rohtak–Panipat & Rohtak–Bawal Section

Safety Consultant for (i) Construction of 4/6 Laning of Delhi/Haryana Border to Rohtak section of NH-10 including Bahadurgarh and Rohtak Bye-passes, (ii) Four Laning of Rohtak–Panipat section of NH-71A, and (iii) 4-Laning of Rohtak–Bawal section of NH-71 (New NH-352) under NHDP Phase-III in the State of Haryana on DBFOT Basis.

Client: National Highways Authority of India



Client: National Highways Authority of India

Construction of NH-56 4-lane bypass connecting NH-56

Appointment of Safety Consultant for Construction of NH-56 4-lane bypass connecting NH-56 at km 17+400 and terminating near Behta Road (bypass

Construction of NH-56 4-Lane Bypass Connecting NH-56

Appointment of Safety Consultant for Construction of NH-56 4-lane bypass connecting NH-56 at km 17+400 and terminating near Behta Road (bypass chainage from km 0.000 to km 32.000/31.489, average length 31.745 km) in the State of Uttar Pradesh under NHDP Phase-VII on EPC Mode (LRR Package-1, Length 31.745 km); Construction of NH-24 Extension 4-lane bypass starting from Behta Road and terminating at Sitapur Road chainage 479.500 (bypass chainage from km 32.000/31.490 to km 64.900/64.380, average length 32.895 km) under NHDP Phase-VII on EPC Mode (LRR Package-2, Length 32.895 km); and Construction of NH-24 4-lane bypass starting from Sitapur Road km 479.500 of NH-24 and terminating at Kursi Road km 17.600 of MDR-77C (bypass chainage from km 64.900/64.380 to km 79.516/79.000, total length 14.618 km) in the State of Uttar Pradesh under NHDP Phase-VII on EPC Mode (LRR Package-3A) – O&M Stage.

Client: National Highways Authority of India



Client: National Highways Authority of India

Construction of Greenfield connectivity to Jewar International Airport from DND – Faridabad – Ballabgarh Bypass KMP Link – Spur to Delhi Mumbai Expressway

Safety Consultant Services for Construction of Greenfield connectivity to Jewar International Airport from DND – Faridabad

Construction of Greenfield connectivity to Jewar International Airport from DND – Faridabad – Ballabgarh Bypass KMP Link – Spur to Delhi Mumbai Expressway

Safety Consultant Services for Construction of Greenfield connectivity to Jewar International Airport from DND – Faridabad – Ballabgarh Bypass KMP Link – Spur to Delhi Mumbai Expressway on HAM under Bharatmala Pariyojana in the state of Haryana & Uttar Pradesh.

Client: National Highways Authority of India


Client: National Highways Authority of India

6-lane Access Controlled Greenfield Highway and Jodhpur Ring Road

Safety Consultant for Construction of 6-lane AC Greenfield Highway (Km 125–Km 150) of NH-754K (AJ/DRGB-Pkg-6), Construction of 6-lane AC Greenfield Highway (Km 150–Km 180) of NH-754A (AJ/DRGB-Pkg-7), Construction of 6-lane AC

6-lane Access Controlled Greenfield Highway and Jodhpur Ring Road

Safety Consultant for Construction of 6-lane AC Greenfield Highway (Km 125–Km 150) of NH-754K (AJ/DRGB-Pkg-6), Construction of 6-lane AC Greenfield Highway (Km 150–Km 180) of NH-754A (AJ/DRGB-Pkg-7), Construction of 6-lane AC Greenfield Highway (Km 180 – Km 207.1) of NH-754A (AJ/DRGB-Pkg-8) and 4-laning of Jodhpur Ring Road in Rajasthan.

Client: National Highways Authority of India


Client: National Highways Authority of India
road2

Indore-Gujarat/MP Border (Start and end point of Bird Sanctuary), (Machilya Ghat Section)

Safety Consultant for Balance work of 4-laning of Indore-Gujarat/MP Border from km 106.210 to km 115.250 (Start and end point of Bird Sanctuary), km 121.740 to km 127.140 (Machilya Ghat Section) and Forest portion km 149.800 to km 150.850

Indore-Gujarat/MP Border (Start and end point of Bird Sanctuary), (Machilya Ghat Section)

Safety Consultant for Balance work of 4-laning of Indore-Gujarat/MP Border from km 106.210 to km 115.250 (Start and end point of Bird Sanctuary), km 121.740 to km 127.140 (Machilya Ghat Section) and Forest portion km 149.800 to km 150.850, km 158.250 to km 158.850 of NH-47 (Old-59) on EPC Mode in the State of Madhya Pradesh.

Client: E5 Infrastructure Pvt. Ltd. Haryana


Client: E5 Infrastructure Pvt. Ltd. Haryana
road2

Gurgaon – Pataudi – Rewari section of NH-352W

Construction of Gurgaon - Pataudi - Rewari section of NH-352W (design length 46.110 km) as Feeder route in the state of Haryana on EPC Mode.



Client: Subhash Infraengineers P. L. Haryana
road2

NH-39 Dimapur- Kohima Road

Road Safety Consultancy for Balance work for Four-laning of NH-39 Dimapur- Kohima Road from Design Km 152.490 to Km 166.700 (Existing Km 156.000 to Km 172.900), in the state of Nagaland under SARDP-NE through an Engineering, Procurement and Construction(EPC) Contract (Package-III)


Client: Nexgen Infra Solution Haryana
road2

Improvement of existing single /Intermediate lane of NH-44

Road Safety Consultancy for Balance work of "Improvement of existing single /Intermediate lane of NH-44 to 2 lane with paved shoulder from Km 230/200 to Km 247/000, Km 261/504

Improvement of Existing Single / Intermediate Lane of NH-44

Road Safety Consultancy for Balance Work of "Improvement of existing Single / Intermediate Lane of NH-44 to 2-Lane with Paved Shoulder from Km 230/200 to Km 247/000, Km 261/504 (Existing Ch. 260/109) to Km 263/191 (Existing Ch. 261/761) and Km 272/241 (Existing Ch. 271/000) to Km 284/033 (Existing Ch. 284/053), Total Length = 30.28 Km, under SARDP-NE (Phase-A) in the State of Assam (Job No. SARDP-NE/NH-44/AS/PWD/2010-11/182)."

Client: Dipayan Paul and Chanchal Paul JV Assam



Client: Dipayan Paul and Chanchal Paul JV Assam
road2

Ramban to Banihal Section of NH-1A, Pkg-II

Road Safety Consultancy for Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), from Ch.158+650 to Ch.164+660 (North Bound) and Ch.160+260 to Ch.163+406

Ramban to Banihal Section of NH-1A, Package-II

Road Safety Consultancy for Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), from Ch. 158+650 to Ch. 164+660 (North Bound) and Ch. 160+260 to Ch. 163+406 (South Bound connecting with Existing Tunnel-T4), excluding Ch. 161+544 to Ch. 164+100 (North Bound), including Construction of Twin Tube Tunnel (Package-II) in the Union Territory of Jammu & Kashmir on EPC Mode.

Client: Ceigall India Punjab


Client: Ceigall India Punjab
road2

Ramban to Banihal Section of NH-1A, Pkg-III

Road Safety Consultancy for Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), from Ch.165+092 to Ch.171+855 (North Bound) and from Ch.166+895 to

Ramban to Banihal Section of NH-1A, Package-III

Road Safety Consultancy for Construction of Four Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44), from Ch.165+092 to Ch.171+855 (North Bound) and from Ch.166+895 to Ch.173+638 (South Bound), excluding section from Ch.166+610 to Ch.167+150 (North Bound), Ch.168+425 to Ch.168+935 (South Bound) and section from Ch.167+960 to Ch.168+168 (North Bound), Ch.169+745 to Ch.169+951 (South Bound) (Package-III) in the Union Territory of Jammu & Kashmir on EPC Mode.

Client: Ceigall India Punjab



Client: Ceigall India Punjab
road2

Rimuli-Koida, New NH -520

Road Safety Consultancy for Construction of new Six Lane Major Bridge including approaches from km 172.895 to km 173.670 of NH-215 (New NH -520) in Rimuli-Koida Section in the State of Odisha under NHDP Phase III on EPC mode.


Client: PRA Odisha
road2

CH/MH Border to Wainganga Bridge Section of NH-6

Construction of Mitigation Measures structures on CH/MH Border to Wainganga Bridge Section of NH-6 (New NH-53) in the State of Maharashtra under Bharat mala Pariyojana on EPC Mode.



Client: SPS Tecno Gurugram Haryana
road2

Jhansi – Orai Section of NH-25

Road Safety Audit of the following project stretches : 4-Lane Jhansi - Orai Section of NH-25, Pkg-1, 2 & 3 - 135kms





Client: NHAI PIU-Jhansi UP
road2

Jhansi – Lalitpur Section of NH-26

Road Safety Audit of the following project stretches : 4-Lane Jhansi - Lalitpur Section of NH-26, Pkg-1 (NS-1/BOT/UP-2) & Pkg-2 (NS- 1/BOT/UP-3) - 99kms




Client: NHAI PIU-Jhansi UP
road2

Feasibility / DPR to take up the long-term measures by Improvement/Solar Blinkers/Highway Lighting for rectification

Preparation of feasibility / DPR to take up the long-term measures by providing LVUP/VUP/Service Roads/Junction Improvement/Solar

Feasibility / DPR to Take Up the Long-Term Measures by Improvement / Solar Blinkers / Highway Lighting for Rectification

Preparation of Feasibility / DPR to take up the long-term measures by providing LVUP/VUP/Service Roads/Junction Improvement/Solar Blinkers/Highway Lighting for rectification of 11 Nos. of MoRTH identified Blackspot locations in Anakapalli to Gundugolanu section from Km. 741.255 to Km. 1022.494 in the State of Andhra Pradesh.

Client: RO NHAI, Vijayawada (AP)


Client: RO NHAI, Vijyawada (AP)
road2

Protection & Mitigation of landslide and erosion of road formation of Holongi to Itanagar section of NH-415

Protection & Mitigation of landslide and erosion of road formation from km 10+000 to km 29+5000 of Holongi to Itanagar section of NH-415 on EPC mode in the state of Arunachal Pradesh.

Client: SPS Tecno Gurugram Haryana
road2

Joram Koloriang Road (NH-713)

Construction of Balance work of 2 Lane with Paved Shoulder of Joram Koloriang Road (NH-713) on EPC Basis From Existing Km 138.00 to Km 158.00 (Design Km 122.353 to Km 138.389) Design Length 16.036 Km in the State of Arunachal Pradesh Under SARDP-NE.


Client: SPS Tecno Gurugram Haryana
road2

Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border Section of Delhi – Vadodara Green Field Alignment (NH-148N)

Construction of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border (Ch. 673.700 to 696.920; Design Ch.221.350 to 244.500) Section of

Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border Section of Delhi – Vadodara Green Field Alignment (NH-148N)

Construction of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border (Ch. 673.700 to 696.920; Design Ch.221.350 to 244.500) Section of Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh(Pkg-23).

Client: GR Infraprojects Ltd. Gujarat


Client: GR Infraprojects Ltd. Gujarat
road2

Construction of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border Section of Delhi – Vadodara Green Field Alignment (NH-148N)

Construction of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border (Ch. 673.700 to 696.920; Design Ch.221.350 to 244.500) Section of

Construction of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border Section of Delhi – Vadodara Green Field Alignment (NH-148N)

Construction of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border (Ch. 673.700 to 696.920; Design Ch.221.350 to 244.500) Section of Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh(Pkg-24).

Client: GR Infraprojects Ltd. Gujarat


Client: GR Infraprojects Ltd. Gujarat
road2

Construction Of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border Section of Delhi – Vadodara Green Field Alignment (NH-148N)

Construction Of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border (Ch. 673.700 to 696.920; Design Ch.221.350 to 244.500) Section of

Construction Of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border Section of Delhi – Vadodara Green Field Alignment (NH-148N)

Construction Of Eight Lane Access-Control Expressway Carriageway from Miyati Village to MP-Gujarat Border (Ch. 673.700 to 696.920; Design Ch.221.350 to 244.500) Section of Delhi – Vadodara Green Field Alignment (NH-148N) on EPC Mode Under Bharatmala Pariyojana in the State of Madhya Pradesh(Pkg-25).

Client: GR Infraprojects Ltd. Gujarat


Client: GR Infraprojects Ltd. Gujarat
road2

Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with NH3 and Taran taran Bypass near Mannawalla village

Construction of four-lane Greenfield Amritsar connectivity for Connection of Amritsar with Delhi-

Construction of Four-Lane Greenfield Amritsar Connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with NH-3 and Tarn Taran Bypass near Mannawalla Village

Construction of Four-Lane Greenfield Amritsar Connectivity for Connection of Amritsar with Delhi-Amritsar-Katra Expressway from Junction with NH-3 and Tarn Taran Bypass near Mannawalla Village (Chainage 70+950) to Junction with NH-354 Ajnala Road near Harsh Chhina Village (Chainage 99+020), from Km 70.950 to Km 99.020 of Amritsar Connectivity, on EPC Mode under Bharatmala Pariyojana in the State of Punjab.

Client: SPS Tecno Gurugram Haryana


Client: SPS Tecno Gurugram Haryana
road2

Construction & up-gradation of existing road to 2-lane with paved shoulder (Lambagarh to Benakuli excluding Benakuli landslide)

Safety Consultancy Services for construction & up-gradation of existing road to 2-lane with paved shoulder from existing chainage km 504+871 to km 508.610 (Lambagarh to Benakuli excluding

Construction & Up-gradation of Existing Road to 2-Lane with Paved Shoulder (Lambagarh to Benakuli Excluding Benakuli Landslide)

Safety Consultancy Services for Construction & Up-gradation of Existing Road to 2-Lane with Paved Shoulder from existing chainage Km 504+871 to Km 508.610 (Lambagarh to Benakuli excluding Benakuli Landslide) in EPC Mode under the Chardham Programme in the State of Uttarakhand (Length: 3.740 Km).

Client: TCS Dehradoon


Client: TCS Dehradoon
road2

Balance work for “Engineering, procurement & Construction of 4/6 Laning of Ranchi – Rargaon Section of NH-33

Road Safety Consultancy for balance work for "Engineering, procurement & Construction of 4/6 Laning of Ranchi - Rargaon Section of NH-33 from Km 140+000 to Km 217+300 in the state of Jharkhand.


Client: Summit Consultancy N. Delhi
road2

Rehabilitation And up gradation of 2-lane with paved shoulder for Jind – Gohana Section of NH-352A

Road Safety Consultancy Services for Rehabilitation And up gradation of 2-lane with paved shoulder for Jind – Gohana Section from existing Km.0+000 to Km 50+505 (Length-50.505km) of NH-352A on EPC mode under NH (O) in the State of Haryana.

Client: E5 Infrastructure Pvt. Ltd. Haryana
road2

Rehabilitation and up gradation of 2-lane with paved shoulder for Jind – Karnal Section

Road Safety Consultancy Services for Rehabilitation and up gradation of 2-lane with paved shoulder for Jind – Karnal Section from existing Km.68+660 (Design km 68+857) i.e. Junction with Narwana Road (NH-352) at Subhash

Rehabilitation and Up Gradation of 2-Lane with Paved Shoulder for Jind – Karnal Section

Road Safety Consultancy Services for Rehabilitation and Up Gradation of 2-Lane with Paved Shoulder for Jind – Karnal Section from existing Km. 68+660 (Design Km. 68+857), i.e. Junction with Narwana Road (NH-352) at Subhash Chowk and ending at Km. 153+700 (Design Km. 154+219) at ITI Chowk, which is the intersection with NH-1 of NH-709A, in the State of Haryana under NH (O) on EPC Mode (Package-II).

Client: E5 Infrastructure Pvt. Ltd. Haryana



Client: E5 Infrastructure Pvt. Ltd. Haryana
road2

Development of entry & exist service road for newly built Wonder Cement Manufacturing Unit along NH-91

Road Safety Consultancy for Development of entry & exist service road for newly built Wonder Cement Manufacturing Unit along NH-91 (Ch. 113+759 RHS) Village Somna Tehsil Gabhana District Aligarh U.P.


Client: Wonder Cement Limited Aligarh
road2

Rehabilitation & widening work for 2 lane with paved shouldering of existing National Highway 80 alignment Bhagalpur-Kahalgoan-Mirzachowki section

Road Safety Consultancy for Rehabilitation & widening work for 2 lane with paved shouldering of existing National Highway 80 alignment from Km. 132.895 to km. 190.150 Bhagalpur-Kahalgoan-Mirzachowki section in the state of Bihar

Client: SPS Tecno Gurugram Haryana
road2

Construction of New Four lane Bridge (Parallel to the Existing Vikramshila Setu) including approach road 35m on Naugachia side & 53m on Bhagalpur side across river Ganga on newly declared NH-131B at Bhagalpur

APPOINTMENT OF ROAD SAFETY CONSULTANT FOR "Construction of New Four lane Bridge

Construction of New Four Lane Bridge (Parallel to the Existing Vikramshila Setu) Including Approach Road Across River Ganga on NH-131B at Bhagalpur

APPOINTMENT OF ROAD SAFETY CONSULTANT FOR "Construction of New Four Lane Bridge (Parallel to the Existing Vikramshila Setu) from Km 8+920 (Design CH. 0+000) to Km 13+375 (Design CH. 4+455) including approach road 35 m on Naugachia side & 53 m on Bhagalpur side across River Ganga on newly declared NH-131B at Bhagalpur in the State of Bihar on EPC Mode."

Client: S.P. Singla Haryana


Client: S.P. Singla Haryana
road2

Improvement/ Widening to 2-Lane with the earthen shoulder of Ranikor – Maheshkhola – Baghmara State Road section from Panda to Baghmara

Safety Consultancy Services for Improvement/ Widening to 2-Lane with the earthen shoulder of Ranikor - Maheshkhola - Baghmara State Road section from Panda to Baghmara

Improvement/ Widening to 2-Lane with the Earthen Shoulder of Ranikor – Maheshkhola – Baghmara State Road Section from Panda to Baghmara

Safety Consultancy Services for Improvement/ Widening to 2-Lane with the Earthen Shoulder of Ranikor - Maheshkhola - Baghmara State Road Section from Panda to Baghmara, existing chainage from Km 119+800 to Km 139.000 (design chainage from Km 112.300 to Km 129.385), Design Length – 17.085 Km (Package-VI), on EPC Mode under SARDP-NE Phase-A in the State of Meghalaya.

Client: SPS Tecno Gurugram Haryana


Client: SPS Tecno Gurugram Haryana
road2

Permanent Solution to Slip Zones on Papu-Yupia-Hoj-Potin Section of NH-713A & NH-13 at Km 18.900 (Kaan Nallah) and Km 37.200 (Kala Mati)

Permanent Solution to Slip Zones on Papu-Yupia-Hoj-Potin Section of NH-713A & NH-13 at Km 18.900 (Kaan Nallah) and Km 37.200 (Kala Mati) in the State of Arunachal Pradesh for the year 2021-22 (Job No. 713A/Ar.P/2021-22/046)

Client: SPS Tecno Gurugram Haryana
road2

Construction of 6-lane access controlled Greenfield highway from km 125+000 to km 150+000 of Deogarh (near Dhandhaniya) to Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor

Appointment of Safety Consultant for Construction of 6-lane

Appointment of Safety Consultant for Construction of 6-lane access controlled Greenfield highway from km 125+000 to km 150+000 of Deogarh (near Dhandhaniya) to Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor

Appointment of Safety Consultant for Construction of 6-lane access controlled Greenfield highway from km 125+000 to km 150+000 of Deogarh (near Dhandhaniya) to Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan under Bharatmala Pariyojana (Phase-I) (AJ/DRGB- Package-6) (Length: 25 km) and Construction of 6-lane access controlled Greenfield highway from km 150+000 to km 180+000 of Deogarh (near Dhandhaniya) to Rajasthan/Gujarat Border section of NH-754A as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-7) (Length: 30 km) and Construction of 6-lane access controlled Greenfield highway from km 180+000 to km 207-100 of Deogarh (near Dhandhaniya) to Rajasthan/Gujarat Border section of NH-754A as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan under Bharatmala Pariyojana (Phase-I) (AJ/DRGB-Package-8) (Length: 27.1 km) and Four laning of Karwar (Km.281.980 of NH 62 Nagaur road) to Dangiyavas section Package-II (Design length 30.093 km) of Jodhpur Ring Road in the state of Rajasthan on EPC Mode under NHDP Phase-VII (Length: 30.093 km).

Client: NHAI PIU-Jodhpur


Client : NHAI PIU-Jodhpur
road2

Construction of Six lane access-controlled Paniyala-Alwar-Barodameo Inter Corridor Route (Paniyala to Matar Section)

Construction of Six lane access-controlled Paniyala-Alwar-Barodameo Inter Corridor Route from Km. 0+000 to Km. 40+080 (Paniyala to Matar Section) in the State of Rajasthan on EPC Mode under Bharatmala Pariyojana on EPC Mode (Package-I)”


Client: SPS Tecno Gurugram Haryana
road2

Amritsar (Airport Junction) to Ramdas

Project of Rehabilitation and Augmentation of New NH-354 of Section Amritsar (Airport Junction) to Ramdas from design Ch. KM ASR 100.835 to Design Ch. KM 139.813 for Length of 38.978 km into Four Lane under Bharatmala (Package-ID on EPC Mode in the state of Punjab.


Client: PS Infra Noida