ROAD SAFETY

Construction of Etawah-Chakeri, Kanpur-Kabrai & Bara-Orai

Safety Consultant for 3 Projects (Etawah-Chakeri Section of NH-2 (New NH-19), Kanpur-Kabrai Section of NH-86 (New NH-34) and Bara-Orai section of NH-25 (New NH-27) on BoT Mode

Client : NHAI - Kanpur /Delhi

Four laning of Aligarh- Kanpur section of NH-91

Safety Consultant for Operation & Maintenance of 4 Lane Jalandhar to Pathankot /J&K; Border from Km. 4.2303 to km. 117.750 /4.000 to km. 16.350 of NH-1A (OMT 21A)


Client : NHAI

Operation & Maintenance of 4 Lane Jalandhar to Pathankot /J&K; Border

Safety Consultant for Operation & Maintenance of 4 Lane Jalandhar to Pathankot /J&K; Border from Km. 4.2303 to km. 117.750 /4.000 to km. 16.350 of NH-1A (OMT 21A)

Client : NHAI

Four laning of Pathankot to Amritsar section of NH-15

Safety Consultant for Four laning of Pathankot to Amritsar section of NH-15 from km. 6+082 to km. 108+502 in the state of Punjab under NHDP Phase III on DBFOT basis (Now NH-54)


Client : NHAI

Four Laning of Ludhina to Talwandi section of NH-95

Safety Consultant for Four Laning of Ludhina to Talwandi section of NH-95 from km. 92+000 to km. 170+00 (Length 78km) in the state of Punjab to be executed on BOT (Toll) on DBFOT basis under NHDP Phase-III

Client : NHAI

Technical Assessment of the corridors in Punjab/Rajasthan

Technical Assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions in the state of Punjab.



Client : NHAI

Construction of Eight Lane access-controlled expressway

Safety Consultant for Construction of Eight Lane access-controlled expressway from junction with SH-175 near Baletiya village of Panchmahal district to junction with SH-63 near Pratap Nagar village of Vadodara district (Ch. 803+420 to 824+920; design Ch. 351+000 to Ch. 372+500) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat.

Client : Patel Infrastructure Ltd. Gujarat

Construction of Four lane elevated road as part of under construction Ganga Path

Safety Consultant for Construction of Four lane elevated road as part of under construction Ganga Path (Digha to Deedarganj) from Dulli Ghat (ch. 13+525.79km) to Nuruddin Ghat (Ch. 16+975.79 km), from Dharamshala Ghat (Ch. 19+890km) to Old NH-30 along with connectivity to Ashok Rajpath at Kangan Ghat (Ch. 15+700km) and Patna Ghat (Ch.16+600km) with allied facilities at Patna in state of Bihar on EPC mode.

Client : GR-Infraprojects Ltd. - New Delhi

Widening and strengthening of Bongaon – Chakdah Road (SH-1)

Safety Consultant for widening and strengthening of Bongaon – Chakdah Road (SH-1) from 2-lane with paved shoulder to standard 4-lane configuration from 0+000 to 6+717 km and from 10+568 to 31+328 km, including 2 truck terminals in Phase 1 (Part A, project length of 27.477 km) excluding Gopalnagar ROB and flyover in the district of North 24 Parganas and Nadia


Client : Bharat Vanijya Eastern Pvt. Ltd. Kolkata

Development of multi-lane carriageway

Safety Consultant for Development of multi-lane carriageway from km. 704.200 to km. 723.000 (from Kanhan to automotive square) section of urban link of Nagpur Kamptee section of Nagpur Jabalpur road of NH-44 to be executed on EPC mode.





Client : KCC Buildcon (P) Ltd. -- Gurugram

Construction of flyover from Liberty cinema to Mental Hospital on Nagpur Obedullaganj Road NH-69

Safety Consultant for Construction of flyover from Liberty cinema to Mental Hospital on Nagpur Obedullaganj Road NH-69 in the State of Maharashtra on EPC Basis.





Client : KCC Buildcon (P) Ltd. -- Gurugram

Construction of VUP at Balikuda, Sikharpur and Badchana on Chandikhole-Jagatpur-Bhubaneswar Section of NH-5

Safety Consultant for Construction of VUP at Balikuda, Sikharpur and Badchana on Chandikhole-Jagatpur-Bhubaneswar Section of NH-5 from Km.414.00 to Km.419.00 and Km.0.00 to 62.00 (Length 67.00 Km) in the state of Odisha to be executed as BOT (Till) project on DBFOT Pattern under NHDP Phase V” - under NH-Division, Bhubaneswar (Odisha)

Client : Bansal Infraprojects - Odisa /Raipur

Construction of Six lane Minor Bridge (Paloli Palam)

Safety Consultant for Construction of Six lane Minor Bridge (Paloli Palam) at Km 203.160, Major Bridge (Moorad) at Km 204.895 & allied works like 6 lane Main Carriageway with Service Road for the section Km.203.000 to Km.205.100 (length of 2.1 Km) of NH-17 (New NH-66) under Bharatmala Pariyojna in the State of Kerala on EPC mode.


Client : E5 Infrastructure Pvt. Ltd.

Construction of VUPs at km. 11.330 (Kalabadia Chowk)

Safety Consultant for Construction of VUPs at km. 11.330 (Kalabadia Chowk) and at km. 14.280 (Kuliana village) in Balasore-Baripada-Jharpokharia Section of NH-5 (New NH-18) in the state of Odisha to be executed on EPC Mode.




Client : E5 Infrastructure Pvt. Ltd.

Lokhandi-Sawargaon-Renapur Section of SH-232

Safety Consultancy for Rehabilitation and Up-gradation of Lokhandi-Sawargaon- Renapur (Latur) Road from existing km 32+225 to 66+693 (SH-232) (Design km. 32+225 to km 66+688) & Ambejogai Bypass from Existing/Design Chainage 0+000 to km 3+815 (SH 211) Two/Four lane with paved shoulders Configuration in the state of Maharashtra on EPC Mode.

Client : GR-Infra Projects Limited

Bhokardhan-Jawkheda-Deaulgaon Raja Road

Safety Consultancy for Bhokardhan-Hasnabad-Jawkheda-Rajur-Deaulgaon Raja Highway from 0+000 (Kumbhari Fata) to km 63+900 (Deaulgaon Raja) and extension from 17+900E (Jawkheda Fata) to 20+730E (Talegaon Fata) Total 66.730 kms to Two lane with paved shoulders in the state of Maharashtra on EPC Basis Contract.

Client : GR-Infra Projects Limited

Kabrai-Banda Section of NH-76

Safety Consultancy for Rehabilitation and upgradation of from km. 178.000 to 215.000 of NH-76 (Kabrai -Banda) to two lane with paved shoulder on EPC mode.




Client : Centrodorstroy India Pvt. Ltd.

Mau – Jasra Section of NH-76

Safety Consultancy for Rehabilitation and upgradation of from km. 326.000 to 379.555 of NH-76 (Mau – Jasra) to two lane with paved shoulder on EPC mode.




Client : Centrodorstroy India Pvt. Ltd.

Kalupur–Lalata Section of of NH-76

Safety Consultancy for Rehabilitation and upgradation of from km. 285.000 to 326.000 of NH-76 (Kalupur – Lalata Road) to two lane with paved shoulder on EPC mode.





Client : Centrodorstroy India Pvt. Ltd.

Multi Sector Road Safety Strategy

Road Safety & Environmental Studies for Develop Model Safe Corridor Demonstration Program (SCDP) for Implementation of Multi Sector Road Safety Strategy in the Stretch from Jalukbari Police Point to Khanapara Police Point via Road-MG Road-GS Road in the City of Guwahati in Assam, World Bank.


Client : PWRD Assam (Govt. of India)

Biharsharif-Barbigha-Mokama Section of NH-82

Safety Consultancy for Two Laning with paved shoulders of Biharsharif-Barbigha-Mokama Section of NH-82 from Design Chainage km 94.478 (Existing Chainage Km 119.320 of NH-31) to Km 149.053 (Exiting Chainage Km 149.020 of NH-82) [Total Design Length – 54.575 Km] in the State of Bihar on EPC mode.

Client : GR-Infra Projects Limited

Zirakpur-Patiala Section of NH-64 (PKG-II)

Safety Consultancy for Rehabilitation and upgradation of NH-64 from km 28.110 to 50.000 (Zirakpur to Patiala Section) to 4-lane in Punjab on EPC basis.



Client : Centrodorstroy India Pvt. Ltd.

Zirakpur-Patiala Section of NH-64 (PKG-I)

Safety Consultancy for Rehabilitation and Upgradation of NH-64 from km 0.000 to 28.110 (Zirakpur to Patiala Section) to 4 lane in Punjab on EPC,



Client : Centrodorstroy India Pvt. Ltd.

Tapa-Bathinda Section of NH-64

Safety Consultancy for Development to Four-Lanes with paved side shoulders of Tapa to Bathinda section of NH-64 [New NH No. 7] from existing Km 168/0 to Km 209/405 in state of Punjab on Engineering Procurement and Construction (EPC) Mode.

Client : Patel Infrastructure Limited

Rudauli to Ghaghara Bridge on NH-233

Proof Consultancy Services – Proof Checking of All Design & Drawing for the Project of Widening & Strengthening to Two-Lane with paved shoulder of Rudauli (Existing chainage km 66.300) to Ghaghara Bridge abutment on Basti town side, section of NH 233 from km 0.000 (Existing chainage km 0.000) to km 122.270 (Existing chainage km 123.000) in the state of Uttar Pradesh under NHDP Phase– IV on EPC mode.

Client : Vijay Construction (I) Pvt. Ltd.

Bhalgarh Flyover & Major Bridge

Safety Consultancy for Design and Construction of of Bhalgarh Flyover at Km 42 (NH-1) and Major Bridge at Km 32 (NH-1) over Drain No. 8.







Client : Gawar Construction Pvt Ltd

ROB Dabwali

Safety Consultancy for Design and Construction of ROB over Railway crossing No. 32‐B on Bhatinda Suratgarh Railway Line on NH‐10 at km 315.240 in Dabwali Town in State of Haryana.






Client : Gawar Construction Pvt Ltd

Jam-Warora Section of SH-264

Road Safety Audit for Jam Warora SH 264 (Maharashtra) 4 Lane 42 KM








Client : ECA Infrastructure

Lokhandi-Sawargaon-Renapur (Latur) Road

Safety Consultant for Rehabilitation and Up-gradation of Lokhandi Sawargaon- Renapur(Latur) Road from existing km 32+225 to 66+693 (SH-232) (Design km. 32+225 to km 66+688) & Ambejogai Bypass from Existing/Design Chainage 0+000 to km 3+815 (SH 211) Two/Four lane with paved shoulders Configuration in the state of Maharashtra on EPC Mode.


Client : GR-Infra Projects Limited

Four Lanning of Akkalkot-Solapur, Solapur –Maharashtra/Karnataka Border & Solapur-Vijayapur Section

Safety Consultant for Construction of (i) Four Lanning of Akkalkot to Solapur (including Akkalkot Bypass of Length 7.35 Km.) from Km. 99.400 to Km 138.352 of NH-150 E, (ii) Solapur to Maharashtra – Karnataka Border Section of NH-9 from km. 251.325 To 348.800, (iii) Solapur-Vijayapur in the State of Maharashtra.

Client: National Highways Authority of India

Vadodara Mumbai Expressway (Phase-II –Pkg XIII, Pkg XI & Pkg XII)

Safety Consultant for Construction of (i) Vadodara Mumbai Expressway (Phase II –Pkg XIII) [Km. 26.582 to Km. 50.700] (Shirsad – Masvan) (ii) Vadodara Mumbai Expressway (Phase II – Pkg XI) [Km. 77.000 to Km. 103.400] (Ganjad – Talsari) (iii) Vadodara Mumbai Expressway (Phase II – Pkg XII) [Km. 50.700 to Km. 77.000] (Masvan – Ganjad) in the State of Maharashtra

Client: National Highways Authority of India

Taloda – Burhanpur Section for up-gradation to 4-lane

“Appointment of Safety Consultant for Consultancy Services for preparation of Detailed Project Report of stretches from Taloda (Km. 143.000) to Burhanpur (km. 383.000) for up-gradation to 4-lane (Length 225 km.) - DPR Stage reg.”




Client: National Highways Authority of India

4-laning Manderdisa-Hatikhali (AS-26), Udali-Manderdisa (AS-27) & Lanka-Udali section (AS-15)

Appointment of Safety Consultant for 4 laning from Manderdisa (Lumding) to Hatikhali section (AS-26) (Length 22.9km) and 4 laning from Udali to Manderdisa (Lumding) section (AS-27) (Length 20.25km) and 4 laning from Lanka to Udali section (AS-15) (Length 18 km)-O&M Stage


Client: National Highways Authority of India

Construction of 4-lanning Greenfield Highway (PKG-II, PKG-III, & PKG-IV of NH-731A

Safety Consultants for stretch under Development /Construction in the State of Uttar Pradesh (Package-II, III &IV): Construction of Four Lane Highway from Km. 35.000 to 49.155 (PKG-II), From Km. 49.155 to 74.700(PKG-III) & From Km. 74.700 to 112.950 (PKG-IV) of NH-731A on HAM in the state of Uttar Pradesh.

Client: Ministry of Road Transport & Highways

Prioritization of Blackspots and Piloting Improvement of High-Priority Blackspots

Consultancy Services for Prioritization of Blackspots and Piloting Improvement of about 20 High-Priority Blackspots in the State of Rajasthan. (WB/RSHDP II/RS/04). Road Length: 1782.10 Km (2-lane), 30 Nos. High-Priority Blackspots, funded by WORLD BANK.


Client: PWD (PPP Division), Government of Rajasthan

Agra-Etawah Bypass, Agra to Aligarh and Agra-Bypass (Southern)

Appointment of Safety Consultants for Agra-Etawah Bypass Section of NH-2 from Km.199.66 to Km.323.525, Agra to Aligarh Section of NH-93 from km 153.000 to Km. 234.215 on BOT Mode, Agra-Bypass (Southern) from Km. 0+000 to Km. 32.800 for a total length of 237.880 Km.


Client: National Highways Authority of India

8-Lanning of Vadodara – Mumbai Expressway (Package-4, 5 & 6)

Appointment of Safety Consultants for Vadodara-Mumbai Expressway from Km 217.500 to Km 292.000, Packages-4,5,6 on HAM (Total Length: 74.50 Km)

Client: National Highways Authority of India

Improvement of sharp curve and other necessary road safety measures (Pkg-1)

Road Safety Audit and suggesting improvement of sharp curve and other necessary road safety measures on the selected stretches of National Highways in the State of Meghalaya. Pkg-1.

Client: NH PWD, Government of Meghalaya

Improvement of sharp curve and other necessary road safety measures (Pkg-2)

Road Safety Audit and suggesting improvement of sharp curve and other necessary road safety measures on the selected stretches of National Highways in the State of Meghalaya. Pkg-2

Client: NH PWD, Government of Meghalaya

Independent Road Safety Audit in selected stretches of different National Highways

Carrying out Independent Road Safety Audit in selected stretches of different National Highways within the state of Assam upto DPR Preparation.






Client: NH PWD, Government of Assam

4/6 Laning of Delhi/Haryana Border to Rohtak, Rohtak- Panipat & Rohtak-Bawal Section

Safety Consultant for (i) Construction of 4/6 Laning of Delhi/Haryana Border to Rohtak section of NH-10 including Bahadurgarh and Rohtak bye-passes, (ii) Four Laning of Rohtak- Panipat section of NH-71A, (iii) 4-laning of Rohtak-Bawal section of NH-71 (New NH-352) under NHDP-III in the state of Haryana on DBFOT basis.


Client: National Highways Authority of India

Construction of 4-lane Lucknow Ring Road (LRR-Pkg-1, LRR-PKg-2 & LRR-Pkg-3A)

Safety Consultant for Construction of NH-56 4-lane bypass connecting NH-56 and terminating near Behta Road (Pkg-1), Construction of NH-24 Extension 4-lane bypass starting from Behta Road and terminating at Sitapur Road (PKg-2), Construction of NH-24 4-lane bypass from Sitapur Road and terminating at Kursi Road in Uttar Pradesh (Pkg-3A)-O&M Stage.

Client: National Highways Authority of India

Construction of Greenfield connectivity to Jewar International Airport from DND – Faridabad – Ballabgarh Bypass KMP Link – Spur to Delhi Mumbai Expressway

Safety Consultant Services for Construction of Greenfield connectivity to Jewar International Airport from DND – Faridabad – Ballabgarh Bypass KMP Link – Spur to Delhi Mumbai Expressway on HAM under Bharatmala Pariyojana in the state of Haryana & Uttar Pradesh.

Client: National Highways Authority of India

6-lane Access Controlled Greenfield Highway and Jodhpur Ring Road

Safety Consultant for Construction of 6-lane AC Greenfield Highway (Km 125–Km 150) of NH-754K (AJ/DRGB-Pkg-6), Construction of 6-lane AC Greenfield Highway (Km 150–Km 180) of NH-754A (AJ/DRGB-Pkg-7), Construction of 6-lane AC Greenfield Highway (Km 180 – Km 207.1) of NH-754A (AJ/DRGB-Pkg-8) and 4-laning of Jodhpur Ring Road in Rajasthan.

Client: National Highways Authority of India