Pre-Bid Consultancy for Engineering Assessment, Technical Carrying out BBD Study & deriving Overlay Thickness and Traffic Survey (Traffic Volume Count) for the Sangrur–Ludhiana section of State of Punjab Highway (4 lane) under OMT.
Client : Patel Infrastructure Limited