Construction of Balance work of 2 Lane with Paved Shoulder of Joram Koloriang Road (NH-713) on EPC Basis From Existing Km 138.00 to Km 158.00 (Design Km 122.353 to Km 138.389) Design Length 16.036 Km in the State of Arunachal Pradesh Under SARDP-NE.
Client: SPS Tecno Gurugram Haryana