Construction of NH-56 4-lane bypass connecting NH-56
Appointment of Safety Consultant for Construction of NH-56 4-lane bypass connecting NH-56 at km 17+400 and terminating near Behta Road (bypass
Construction of NH-56 4-Lane Bypass Connecting NH-56
Appointment of Safety Consultant for Construction of NH-56 4-lane bypass connecting NH-56 at km 17+400 and terminating near Behta Road (bypass chainage from km 0.000 to km 32.000/31.489, average length 31.745 km) in the State of Uttar Pradesh under NHDP Phase-VII on EPC Mode (LRR Package-1, Length 31.745 km); Construction of NH-24 Extension 4-lane bypass starting from Behta Road and terminating at Sitapur Road chainage 479.500 (bypass chainage from km 32.000/31.490 to km 64.900/64.380, average length 32.895 km) under NHDP Phase-VII on EPC Mode (LRR Package-2, Length 32.895 km); and Construction of NH-24 4-lane bypass starting from Sitapur Road km 479.500 of NH-24 and terminating at Kursi Road km 17.600 of MDR-77C (bypass chainage from km 64.900/64.380 to km 79.516/79.000, total length 14.618 km) in the State of Uttar Pradesh under NHDP Phase-VII on EPC Mode (LRR Package-3A) – O&M Stage.