Pre-Bid Engineering Consultancy Services for Four / Six Laning of Bodhre (km 390.000) to Dhule (km 452.800) section of NH-211 (new NH No. 52); (Existing Length 62.800 km; Design Length 67.231 km) under BOT (toll) on DBFOT pattern in the state of Maharashtra under phase NHDP-IV on Hybrid Annuity Mode
Client : Patel Infrastructure Limited